Self Consolidating Concrete
Self Consolidating Concrete
(OP)
What needs to be specified for self consolidating concrete for architecturally exposed columns and architecturally exposed walls, beyond what is stated in CSA A23.1? Specifically, what slump flow should be specified? What other (if any) parameters from the attached Table should be specified?





