INTELLIGENT WORK FORUMS
FOR ENGINEERING PROFESSIONALS

Log In

Come Join Us!

Are you an
Engineering professional?
Join Eng-Tips Forums!
  • Talk With Other Members
  • Be Notified Of Responses
    To Your Posts
  • Keyword Search
  • One-Click Access To Your
    Favorite Forums
  • Automated Signatures
    On Your Posts
  • Best Of All, It's Free!

*Eng-Tips's functionality depends on members receiving e-mail. By joining you are opting in to receive e-mail.

Posting Guidelines

Promoting, selling, recruiting, coursework and thesis posting is forbidden.

Jobs

HTRI, modeling of an thermosyphon reboiler

HTRI, modeling of an thermosyphon reboiler

(OP)
Hi everyone, i'm new member of this community and i'm happy to join it. So, i have a very difficult question for me with a modeling of an thermosyphon reboiler in HTRI Xchanger Suite. I working at real project of an involvement strait run gasoline to a hydrocracking fractionation section and at first stage of the project i should to model one of the columns which has an thermosyphon reboiler TEMA type AJ12S. It has an one inlet nozzle and two outlet nozzles, there are two pipes connected to these nozzles which connected thru tee to one pipe connected to the column. The scheme and screenshots are included in attachment. So, here is a question, how i should specified in HTRI in detailed piping the two pipes from nozzles-->tee--->pipe to the column if in section "Piping--->Outlet" i have space only for one pipe. I dont know how to tell HTRI that i have two pipes connected to these nozzles which connected thru tee to one pipe connected to the column. Please help me to solve this problem.
P.S Sorry for mistakes, i'm not a native speaker.

Spoiler:


RE: HTRI, modeling of an thermosyphon reboiler

Are you trying to set up the entire piping run from the column, through the thermosyphon reboiler, and the 2 phase line return back to the column all on HTRI ?

If HTRI cannot configure the exit piping from these 2 nozzles on the J shell, and do the entire hydraulics for you, that may not be too much of a problem. You could do the piping line hydraulics for the single phase feed to the reboiler and the 2 phase line return ( including this collection manifold on the J shell) separately on some other program, and let HTRI do the thermohydraulics on the reboiler only.

By the way, the simplified sketch here indicates this is a once through thermosyphon reboiler. Check that this is actually the case by looking at the weir arrangement in the bottoms compartment of this column.

Red Flag This Post

Please let us know here why this post is inappropriate. Reasons such as off-topic, duplicates, flames, illegal, vulgar, or students posting their homework.

Red Flag Submitted

Thank you for helping keep Eng-Tips Forums free from inappropriate posts.
The Eng-Tips staff will check this out and take appropriate action.

Reply To This Thread

Posting in the Eng-Tips forums is a member-only feature.

Click Here to join Eng-Tips and talk with other members!


Resources


Close Box

Join Eng-Tips® Today!

Join your peers on the Internet's largest technical engineering professional community.
It's easy to join and it's free.

Here's Why Members Love Eng-Tips Forums:

Register now while it's still free!

Already a member? Close this window and log in.

Join Us             Close