INTELLIGENT WORK FORUMS
FOR ENGINEERING PROFESSIONALS

Log In

Come Join Us!

Are you an
Engineering professional?
Join Eng-Tips Forums!
  • Talk With Other Members
  • Be Notified Of Responses
    To Your Posts
  • Keyword Search
  • One-Click Access To Your
    Favorite Forums
  • Automated Signatures
    On Your Posts
  • Best Of All, It's Free!
  • Students Click Here

*Eng-Tips's functionality depends on members receiving e-mail. By joining you are opting in to receive e-mail.

Posting Guidelines

Promoting, selling, recruiting, coursework and thesis posting is forbidden.

Students Click Here

Jobs

Meggering a load bank, different values when bonding frame

Meggering a load bank, different values when bonding frame

Meggering a load bank, different values when bonding frame

(OP)
All,

Unusual problem that I can't explain, looking for some help:

We have a 480V, 3phase, 2MW resistor load bank for testing generators. If we megger the phases with respect to the frame, with the unit's frame not bonded, we get high MegaOhms on all phases. If we then bond the frame, and repeat the test, phase B reads ~500kohms. Phase A and C still read high MegaOhms.

I can't explain it, because I haven't moved the test leads between Phase B and the frame. I only bonded the frame to the ground grid with an insulated conductor and then phase B resistance dramatically drops. No other cables are connected to the load bank. It is just a load bank, on a skid frame, unconnected and sitting on graded dirt.

If there was an insulation resistance problem with phase B, without moving the leads from phase B and equipment frame, why does it not show until the frame is bonded to the ground grid? The test leads are still in parallel with phase B and the frame. How does grounding the frame, now introduce an insulation leak? Also worth mentioning that the Megger unit is a portable, battery operated tester.

RE: Meggering a load bank, different values when bonding frame

Have you meggered the phases to ground or only to the frame? Sounds to me like you've got a B-Ground problem that doesn't show if you test between the phase and the floating frame.

RE: Meggering a load bank, different values when bonding frame

(OP)
Just across the frame.

We didn't have the opportunity to investigate further. Just a weird but interesting problem. Vendor took the unit back today. Wanted to post it here if anyone seen something similar.

Red Flag This Post

Please let us know here why this post is inappropriate. Reasons such as off-topic, duplicates, flames, illegal, vulgar, or students posting their homework.

Red Flag Submitted

Thank you for helping keep Eng-Tips Forums free from inappropriate posts.
The Eng-Tips staff will check this out and take appropriate action.

Reply To This Thread

Posting in the Eng-Tips forums is a member-only feature.

Click Here to join Eng-Tips and talk with other members!


Resources