INTELLIGENT WORK FORUMS
FOR ENGINEERING PROFESSIONALS

Log In

Come Join Us!

Are you an
Engineering professional?
Join Eng-Tips Forums!
  • Talk With Other Members
  • Be Notified Of Responses
    To Your Posts
  • Keyword Search
  • One-Click Access To Your
    Favorite Forums
  • Automated Signatures
    On Your Posts
  • Best Of All, It's Free!

*Eng-Tips's functionality depends on members receiving e-mail. By joining you are opting in to receive e-mail.

Posting Guidelines

Promoting, selling, recruiting, coursework and thesis posting is forbidden.

Jobs

A335 P22

A335 P22

(OP)
in accordance to ASME SEC IX QW-431. can we do a PQR using ER70S-6+ E7018-1 to weld A335 P22 IF PWHT NOT REQUIRED.

RE: A335 P22

Yes, you can.

RE: A335 P22

While you can do so, why would you unless you were welding P22 to carbon steel? Generally P22 is used at temperatures above the useful range of carbon steel or in corrosion service that would lead to rapid, potentially catastrophic failure.

RE: A335 P22

Agree with stanweld. However, there have been applications where blow down/drain lines have transitioned from P22 to carbon steel because of erosion concerns up stream.

Red Flag This Post

Please let us know here why this post is inappropriate. Reasons such as off-topic, duplicates, flames, illegal, vulgar, or students posting their homework.

Red Flag Submitted

Thank you for helping keep Eng-Tips Forums free from inappropriate posts.
The Eng-Tips staff will check this out and take appropriate action.

Reply To This Thread

Posting in the Eng-Tips forums is a member-only feature.

Click Here to join Eng-Tips and talk with other members!


Resources


Close Box

Join Eng-Tips® Today!

Join your peers on the Internet's largest technical engineering professional community.
It's easy to join and it's free.

Here's Why Members Love Eng-Tips Forums:

Register now while it's still free!

Already a member? Close this window and log in.

Join Us             Close