INTELLIGENT WORK FORUMS
FOR ENGINEERING PROFESSIONALS

Log In

Come Join Us!

Are you an
Engineering professional?
Join Eng-Tips Forums!
  • Talk With Other Members
  • Be Notified Of Responses
    To Your Posts
  • Keyword Search
  • One-Click Access To Your
    Favorite Forums
  • Automated Signatures
    On Your Posts
  • Best Of All, It's Free!
  • Students Click Here

*Eng-Tips's functionality depends on members receiving e-mail. By joining you are opting in to receive e-mail.

Posting Guidelines

Promoting, selling, recruiting, coursework and thesis posting is forbidden.

Students Click Here

Jobs

Load consideration and settlement for Abutment MSE Wall

Load consideration and settlement for Abutment MSE Wall

Load consideration and settlement for Abutment MSE Wall

(OP)
Good day!

I am designing an mse wall abutment (stub abutment supported by deep foundation). I have already designed MSE walls before the bridge abutment (along/parallel to traffic). In my understanding, if the conditions for back-to-back MSE walls in the NHI code are satisfied (length of reinforcement overlap, ratio of height of wall to width of railway, etc), then there would be no more retained fill consideration.

Would this be the case for the front MSE wall, perpendicular to traffic? Since the grids for the front mse wall would be overlapping with the mse walls from both sides?

Another issue that needs to be addressed is settlement. There is a 0.6m diameter high pressure water supply pipe 1.2m below N.G.L. and directly below the guideway. The height of the MSE wall at the abutment would be 8.0m from N.G.L. which would be fill/reinforced soil.

At the abutment area, the load from the girders would be transferred to the stub abutment supported by 3 drilled shafts which are positioned to avoid the pipe. Would there be significant downdrag from the shafts that would affect the pile? If so, what should be the minimum face to face distance of the shaft from the pipe?

In the other parts of MSE wall with heights ranging from 3.5m to 8.0m of reinforced soil above N.G.L., how is settlement prevented so that the pipe underneath would not burst?

Red Flag This Post

Please let us know here why this post is inappropriate. Reasons such as off-topic, duplicates, flames, illegal, vulgar, or students posting their homework.

Red Flag Submitted

Thank you for helping keep Eng-Tips Forums free from inappropriate posts.
The Eng-Tips staff will check this out and take appropriate action.

Reply To This Thread

Posting in the Eng-Tips forums is a member-only feature.

Click Here to join Eng-Tips and talk with other members!


Resources