INTELLIGENT WORK FORUMS
FOR ENGINEERING PROFESSIONALS

Log In

Come Join Us!

Are you an
Engineering professional?
Join Eng-Tips Forums!
  • Talk With Other Members
  • Be Notified Of Responses
    To Your Posts
  • Keyword Search
  • One-Click Access To Your
    Favorite Forums
  • Automated Signatures
    On Your Posts
  • Best Of All, It's Free!

*Eng-Tips's functionality depends on members receiving e-mail. By joining you are opting in to receive e-mail.

Posting Guidelines

Promoting, selling, recruiting, coursework and thesis posting is forbidden.

Jobs

QCQA for Roads - alpha, should the LSL, and engineering limit be a mean value? Or adjust?

QCQA for Roads - alpha, should the LSL, and engineering limit be a mean value? Or adjust?

QCQA for Roads - alpha, should the LSL, and engineering limit be a mean value? Or adjust?

(OP)
Hi,

I am doing a QC/QA analysis for road state department I'm at for my internship. But I've hit a key stumbling block.

The minimum 'engineering limit' strength is 2900 psi. The "LSL" is 3900 psi. However my understanding is that the LSL should be a minimum *mean* value for a lot - whereas in this case we begin to pay the contractor less as soon as 10% of the product falls below 3900 psi. Does this mean that for a QC/QA analysis I should account for that and make the minimum mean LSL 3900 - z (value will be -1.28155, cancelling negative) * standard deviation (for distribution, not mean), bringing the lowest mean value to above the LSL?

Or am I over-complicating it?! Should I just take the value of LSL from the spec and apply it as the critical value that less than is alpha? I am so confused and really need help!

Thank-you

RE: QCQA for Roads - alpha, should the LSL, and engineering limit be a mean value? Or adjust?

First, I would suggest you ask your fellow engineers at work this question. Part of being an intern is knowing you need help from people with more experience.

I'm guessing that LSL stands for Lower Specification Limit, meaning that if the testing results are coming in at lower than the LSL, the contractor will be penalized for continually having under spec material (i.e., over 10%). If any of the material goes below 2900 psi, that material needs to be rejected and not be used.

I'm not sure if you're trying to account for assuming a certain percentage will be less than the LSL for cost for the project with your LSL 3900 - z*SD. Considering none of the material may be lower than the LSL, you'd probably be more conservative with your budget not to assume the will be any penalty costs to the contractor. Odds are, you'll need to add some contingency costs to adjust for items that go over budget.

RE: QCQA for Roads - alpha, should the LSL, and engineering limit be a mean value? Or adjust?

(OP)
"First, I would suggest you ask your fellow engineers at work this question. Part of being an intern is knowing you need help from people with more experience."

I have taken this to my manager, as well as another senior Engineer in the building. I haven't got a definitive answer on this particular topic as this isn't something they have dealt with in a long time, so I thought I'd give this a crack to reach a wider audience.

I'll post again with my methodology once I have it nailed down.

Red Flag This Post

Please let us know here why this post is inappropriate. Reasons such as off-topic, duplicates, flames, illegal, vulgar, or students posting their homework.

Red Flag Submitted

Thank you for helping keep Eng-Tips Forums free from inappropriate posts.
The Eng-Tips staff will check this out and take appropriate action.

Reply To This Thread

Posting in the Eng-Tips forums is a member-only feature.

Click Here to join Eng-Tips and talk with other members!


Resources


Close Box

Join Eng-Tips® Today!

Join your peers on the Internet's largest technical engineering professional community.
It's easy to join and it's free.

Here's Why Members Love Eng-Tips Forums:

Register now while it's still free!

Already a member? Close this window and log in.

Join Us             Close