INTELLIGENT WORK FORUMS
FOR ENGINEERING PROFESSIONALS

Log In

Come Join Us!

Are you an
Engineering professional?
Join Eng-Tips Forums!
  • Talk With Other Members
  • Be Notified Of Responses
    To Your Posts
  • Keyword Search
  • One-Click Access To Your
    Favorite Forums
  • Automated Signatures
    On Your Posts
  • Best Of All, It's Free!
  • Students Click Here

*Eng-Tips's functionality depends on members receiving e-mail. By joining you are opting in to receive e-mail.

Posting Guidelines

Promoting, selling, recruiting, coursework and thesis posting is forbidden.

Students Click Here

Jobs

Pipeline Hydrostatic Test Temperature Probe Location

Pipeline Hydrostatic Test Temperature Probe Location

Pipeline Hydrostatic Test Temperature Probe Location

(OP)
How far from surface piping should buried temperature probes be installed to avoid temperature fluctuation due to ambient temperature change during a hydrotest. I'm trying to specify the location of temperature probes for a buried pipeline hydrostatic test. I've found several sources online that specify the the temperature probes should be buried .5Km from any surface piping. Several people in my company want to place the buried temperature probes within 200 ft of the launcher where the test equipment is located. The temperature probes I'm referring to are the ones that attach to the pipeline. I've also seen references that specify buried temperature probes not attached to pipeline.

RE: Pipeline Hydrostatic Test Temperature Probe Location

I can't see any benefit going much more than 10m of buried line myself. you're not going to get any significant heating effect beyond that and the water flow is zero.

Making it inside the fenceline of the facility makes sense to me.

For longer lines you need at least a mid point one at a suitable point ( road crossings etc) if you can.

Remember - More details = better answers
Also: If you get a response it's polite to respond to it.

RE: Pipeline Hydrostatic Test Temperature Probe Location

I've recently been completing testing specs and though our company just specifies one buried either end of the test section and the mid-point, most of contractors are putting an additional probe on the line due to the low ground temps and wanting to use water only rather than dealing with methanol. The key is how long the test section is. I agree with little inch that 10m should be plenty. I'm not sure what significant benefit you get from probes not attached to the line other than a reference ground temp.

Red Flag This Post

Please let us know here why this post is inappropriate. Reasons such as off-topic, duplicates, flames, illegal, vulgar, or students posting their homework.

Red Flag Submitted

Thank you for helping keep Eng-Tips Forums free from inappropriate posts.
The Eng-Tips staff will check this out and take appropriate action.

Reply To This Thread

Posting in the Eng-Tips forums is a member-only feature.

Click Here to join Eng-Tips and talk with other members!


Resources