INTELLIGENT WORK FORUMS
FOR ENGINEERING PROFESSIONALS

Log In

Come Join Us!

Are you an
Engineering professional?
Join Eng-Tips Forums!
  • Talk With Other Members
  • Be Notified Of Responses
    To Your Posts
  • Keyword Search
  • One-Click Access To Your
    Favorite Forums
  • Automated Signatures
    On Your Posts
  • Best Of All, It's Free!
  • Students Click Here

*Eng-Tips's functionality depends on members receiving e-mail. By joining you are opting in to receive e-mail.

Posting Guidelines

Promoting, selling, recruiting, coursework and thesis posting is forbidden.

Students Click Here

Jobs

ASCE 113 Deflection

ASCE 113 Deflection

ASCE 113 Deflection

(OP)
I was wondering how anyone familiar with substation steel design has been handling deflection due to rotation per ASCE 113. Specifically, I frequently have columns with rotation, causing deflection in horizontal members.

For instance, if I have a Class B structure, the vertical member (cantilever column) has a limit of l/100, while the horizontal (cantilever) has l/200. If the column has some rotation, even less than 1 degree, that may cause a total displacement of the horizontal member greater than l/200, even though the horizontal member locally has very little deflection.

113 does not specifically speak to rotation of members, so how are you typically handling this? Should we disregard the displacement due to rotation or consider total displacement regardless of cause?

Thanks in advance.

RE: ASCE 113 Deflection

I don't have my copy here at home , but IIRC our intent ( I was on the original ASCE 113 committee) was to limit the deflection of the horizontal member to L/XXX with respect to its connection at the column. So I believe it was a local deflection. We are currently revising the document ( I Chair the revision committee) and the new figures may clear up the concept.

Now, you do realize the load case for the deflection is a reduced wind speed (5 year MRI) instead of the maximum wind on the structure. Off the top of my balding head, there was a 0.78 factor to convert the 50 year MRI to the 5 year MRI in one of the tables and I believe the intent was to apply the factor to the wind velocity and not the pressure so the effect was squared.

My personal opinion is the deflection limits are over rated. If you cable connect all the electrical stuff and allow the structure to move around (within reason) the whole reason for deflection limits goes away. The biggest problem is the "A" connection from the high bus to the low bus where it turns a corner. If you hit the bus with a big Short Circuit, the A frame will shake apart. We have eliminated the "A" connection for our bus runs on new stations.

_____________________________________
I have been called "A storehouse of worthless information" many times.

RE: ASCE 113 Deflection

(OP)
Thanks transmissiontowers! It has been my interpretation as well this was a local deflection.

I am using the squared value in the deflection checks.

Do you know when you anticipate having the newest version of 113 out? How frequently do committee positions become available?

RE: ASCE 113 Deflection

It's hard to predict when publication will be. We have gone through about 900 committee comments and the first round of revising for the committee comments is getting done. We still need to go through Peer Review and address those comments. We are trying to have a "Pre-Standard" appendix that will be a first look at what we think an ASCE Standard would look like for substation structure design.

The committee is not accepting new members since we are a few years into the revision, but after it is published and out in use for a few years, there will be another committee started to create a Standard if ASCE feels that there is interest in going beyond a Guide.

The original committee started in the late 1980's to publish the first edition because it was felt that there was no Guide available for the unique structures in a Substation and we wanted to pass along the knowledge that we had gained to the new Engineers coming out of school. It was a long process to get that first edition published and we hope that it was on target.

_____________________________________
I have been called "A storehouse of worthless information" many times.

Red Flag This Post

Please let us know here why this post is inappropriate. Reasons such as off-topic, duplicates, flames, illegal, vulgar, or students posting their homework.

Red Flag Submitted

Thank you for helping keep Eng-Tips Forums free from inappropriate posts.
The Eng-Tips staff will check this out and take appropriate action.

Reply To This Thread

Posting in the Eng-Tips forums is a member-only feature.

Click Here to join Eng-Tips and talk with other members!


Resources


Close Box

Join Eng-Tips® Today!

Join your peers on the Internet's largest technical engineering professional community.
It's easy to join and it's free.

Here's Why Members Love Eng-Tips Forums:

Register now while it's still free!

Already a member? Close this window and log in.

Join Us             Close