INTELLIGENT WORK FORUMS
FOR ENGINEERING PROFESSIONALS

Log In

Come Join Us!

Are you an
Engineering professional?
Join Eng-Tips Forums!
  • Talk With Other Members
  • Be Notified Of Responses
    To Your Posts
  • Keyword Search
  • One-Click Access To Your
    Favorite Forums
  • Automated Signatures
    On Your Posts
  • Best Of All, It's Free!
  • Students Click Here

*Eng-Tips's functionality depends on members receiving e-mail. By joining you are opting in to receive e-mail.

Posting Guidelines

Promoting, selling, recruiting, coursework and thesis posting is forbidden.

Students Click Here

Jobs

Braced Frame Baseplate Connection

Braced Frame Baseplate Connection

Braced Frame Baseplate Connection

(OP)
I am designing a 4-part milti-story steel frame with composite deck, buildings range from 3-5 stories, largest columns are W14x120. The lateral bracing mainly consists of chevron frames, using base plates recessed 8" into concrete at the foundation. The foundation is a one-way slab over a 6' deep crawl space supported on concrete beams spanning between concrete columns, which are supported on pile caps supported on auger cast piers. The slabs are 8"-10" thick so the anchors will be cast in at the same elevation as the beam/slab joint. When sizing the anchors for base plates at braced frames, concrete breakout is an obviously an issue as their is a high amount of shear. Is it acceptable to set these anchors in in a concrete beam (probably 32"-48" wide) and negate the shear breakout by using hairpins that hook around the exterior anchors (see attached sketch)? I'm also hooking the concrete column reinforcement into the slab for tension reinforcement. I know this conforms to ACI 318 Appendix D, but am a little uneasy about it since I haven't been able to find much information on this topic and I have only seen hairpins used on metal buildings. Without using shear reinforcement, very large concrete column capitals would be required and that is not really an option since some of the braced frames are located about 1' off of expansion joints.

RE: Braced Frame Baseplate Connection

I think you are OK as long as the reinforcing is properly developed, and near the top of the beam, so that the horizontal reaction from the braced frame is transferred into the beam.

You must also deal with the vertical (uplift) reaction, of course.

DaveAtkins

Red Flag This Post

Please let us know here why this post is inappropriate. Reasons such as off-topic, duplicates, flames, illegal, vulgar, or students posting their homework.

Red Flag Submitted

Thank you for helping keep Eng-Tips Forums free from inappropriate posts.
The Eng-Tips staff will check this out and take appropriate action.

Reply To This Thread

Posting in the Eng-Tips forums is a member-only feature.

Click Here to join Eng-Tips and talk with other members!


Resources