RePad in two pieces
RePad in two pieces
(OP)
In the framework of ASME VIII-1, can I make a RePad in two pieces? (See attached figure)
The welds between the two parts would be butt. There would be a ventilation hole in each part.
Can the longitudinal welds be considered as category A and the circumferential category B as per Fig UW-3?
Thanks for your opinions.
The welds between the two parts would be butt. There would be a ventilation hole in each part.
Can the longitudinal welds be considered as category A and the circumferential category B as per Fig UW-3?
Thanks for your opinions.





RE: RePad in two pieces
Regards,
Mike
The problem with sloppy work is that the supply FAR EXCEEDS the demand
RE: RePad in two pieces
RE: RePad in two pieces
RE: RePad in two pieces
RE: RePad in two pieces
RE: RePad in two pieces
General Blr. CA,USA
RE: RePad in two pieces
Not sure what you are stating but:
Repad can be in two pieces....seamless is not required.
Weld in two-piece repad is not categorized.
Attach the two-piece repad with weld transverse to the longitudinal axis of the horizontal vessel, and save the money that would be spent on RT.
RE: RePad in two pieces