INTELLIGENT WORK FORUMS
FOR ENGINEERING PROFESSIONALS

Log In

Come Join Us!

Are you an
Engineering professional?
Join Eng-Tips Forums!
  • Talk With Other Members
  • Be Notified Of Responses
    To Your Posts
  • Keyword Search
  • One-Click Access To Your
    Favorite Forums
  • Automated Signatures
    On Your Posts
  • Best Of All, It's Free!
  • Students Click Here

*Eng-Tips's functionality depends on members receiving e-mail. By joining you are opting in to receive e-mail.

Posting Guidelines

Promoting, selling, recruiting, coursework and thesis posting is forbidden.

Students Click Here

Jobs

repad - UG37 of BPVC VIII-1

repad - UG37 of BPVC VIII-1

repad - UG37 of BPVC VIII-1

(OP)
Does anyone know of a vendor that stock or make the repads specified to UG37 of the code. The outside contractor I work with doesn't know and I am not in the pressure vessel industry.

I thought a machine shop could make the repad from a flat piece of metal and form it to the outside diameter of the vessel...

see attachment for repad that I'm referring to.

Thanks!

RE: repad - UG37 of BPVC VIII-1

monk1999, doubt your will find any stock, they tend to be all different. Shouldn't be a problem finding someone to make them, anybody that rolls plate should be able to do it.

Regards,

Mike

The problem with sloppy work is that the supply FAR EXCEEDS the demand

RE: repad - UG37 of BPVC VIII-1

Any fabrication shop could make up these repads.

These repads would likely meet the requirements of UG-37, but I'm hoping you are still performing calculations to support the design. There are all sorts of special cases where these might not work (large openings/etc...).

Cheers,
Marty

RE: repad - UG37 of BPVC VIII-1

(OP)
Thanks guys, really appreciate it!

@SnTman, that are probably not stock, you're right.
@Marty, yes, I did use the boiler code to confirm the design.

As a follow up question related to nozzle reinforcement. Does the boiler code allow for a saddle instead of a repad? Seems like saddle is more common in process piping world - ASME B31.3. The boiler code does mention saddle but doesn't really goes into specifics on analysis. Our vendor isn't too fond of using the repad because of the inner weld between the nozzle and the repad. As he explains it, you have a fillet on top of a weld. With a saddle, it's two fillets welds and there are no welds that stacks on another weld.

Regards,
Monk

RE: repad - UG37 of BPVC VIII-1

Monk,

A saddle is listed in the code in Fig.UG-40(f), and UW-16.1(f-1).

I don't know of any software that directly models this, but it could be calculated in the same way as for a repad. The effective repad thickness would just be the saddle thickness minus the shell thickness.

Cheers,
Marty

RE: repad - UG37 of BPVC VIII-1

(OP)
Hi Marty, I see what you're saying. My vendor was thinking of the saddle on top of the vessel shell, not replacing it. Has anyone done analysis for that configuration of saddle on top of shell at the nozzle? Is it significantly different?

Thanks!
Monk

RE: repad - UG37 of BPVC VIII-1

Quote (monk1999)

With a saddle, it's two fillets welds and there are no welds that stacks on another weld.

Please explain, how about a sketch? UG-40(j) maybe?

The problem with sloppy work is that the supply FAR EXCEEDS the demand

RE: repad - UG37 of BPVC VIII-1

(OP)
good point. See attachment of the reinforcing saddle.

-Monk

RE: repad - UG37 of BPVC VIII-1

No attachment...

RE: repad - UG37 of BPVC VIII-1

Hmmm, never seen such an arrangement. Nevertheless I don't see why it could not be treated as a re-pad under UG-37. It looks to me like could be treated as both a pad on the vessel wall (Sketch UG-40(b-1)) and a pad on the nozzle wall (sketch UG-40(b-2)), if that much area was needed. Subject to the thickness of the element (te) and limits of reinforcement. Also subject to provisions for a split pad (UG-37(h)).

As compared to a plain old pad, it looks like an expensive detail to me...

Regards,

Mike

The problem with sloppy work is that the supply FAR EXCEEDS the demand

RE: repad - UG37 of BPVC VIII-1

Very expensive!

RE: repad - UG37 of BPVC VIII-1

(OP)
Thanks for the input!

Red Flag This Post

Please let us know here why this post is inappropriate. Reasons such as off-topic, duplicates, flames, illegal, vulgar, or students posting their homework.

Red Flag Submitted

Thank you for helping keep Eng-Tips Forums free from inappropriate posts.
The Eng-Tips staff will check this out and take appropriate action.

Reply To This Thread

Posting in the Eng-Tips forums is a member-only feature.

Click Here to join Eng-Tips and talk with other members!


Resources