Fire Protection Topping
Fire Protection Topping
(OP)
How's the performance of fire directly on floor slabs? Do you really need to put 1" of concrete topping over top of finished concrete slabs (one month after) for fire protection? Or would the slabs be sufficient supposed the rebar is 1.5" below the top of the slab?






RE: Fire Protection Topping