INTELLIGENT WORK FORUMS
FOR ENGINEERING PROFESSIONALS

Log In

Come Join Us!

Are you an
Engineering professional?
Join Eng-Tips Forums!
  • Talk With Other Members
  • Be Notified Of Responses
    To Your Posts
  • Keyword Search
  • One-Click Access To Your
    Favorite Forums
  • Automated Signatures
    On Your Posts
  • Best Of All, It's Free!
  • Students Click Here

*Eng-Tips's functionality depends on members receiving e-mail. By joining you are opting in to receive e-mail.

Posting Guidelines

Promoting, selling, recruiting, coursework and thesis posting is forbidden.

Students Click Here

Jobs

Circular Ties in Auger Cast in Place Piles per ACI 318-14 25.7.2.4.1

Circular Ties in Auger Cast in Place Piles per ACI 318-14 25.7.2.4.1

Circular Ties in Auger Cast in Place Piles per ACI 318-14 25.7.2.4.1

(OP)
Circular Ties in Auger Cast in Place Piles per ACI 318-14 25.7.2.4.1

Has anyone come across documentation justifying the use of lap splices in circular ties over the hooked ends detail described in ACI 318-14 25.7.2.4.1?

Per the code, circular ties need to have a minimum overlap of 6” and each end needs to terminate with a standard hook around a vertical bar. This seems to be a valid choice in heavy compression loaded columns where vertical reinforcement is acting as compression reinforcement. However if one is to use this circular tie detail in auger cast piles of 18” diameter or less, the hooked ends of the ties congest the center of the cage to where running a center bar through the middle with a spacer “football” becomes very difficult.

I have not found an exclusion/exception to the tie detail. This would leave spiral ties as the only viable tie method. Typically our pile designs only need vertical bars for flexural reinforcement in the top 25 ft or so and the shear loads are half the concrete capacity. So the circular ties are mainly for holding the vertical bars in place for casting.

RE: Circular Ties in Auger Cast in Place Piles per ACI 318-14 25.7.2.4.1

Haven't checked the actual code provisions in 318 but I seem to remember at a recent seminar on 318 that the speaker mentioned that they changed this requirement - that lap splices were no longer allowed in circular ties.

Check out Eng-Tips Forum's Policies here:
FAQ731-376: Eng-Tips.com Forum Policies

RE: Circular Ties in Auger Cast in Place Piles per ACI 318-14 25.7.2.4.1

You could use a 180° hook rather than the 90° hooks shown in 25.7.2.4.1.

Professional Engineer (ME, NH, MA) Structural Engineer (IL)
American Concrete Industries
www.americanconcrete.com

RE: Circular Ties in Auger Cast in Place Piles per ACI 318-14 25.7.2.4.1

Or you could decide that Auger Cast are not columns, but something else, and not foloow the ACI 318 column requirements.
Pros
  • Round
  • Carry axial loads

  • Cons
    [ul]
  • Cast against soil
  • Loads continuously transferred into ground

RE: Circular Ties in Auger Cast in Place Piles per ACI 318-14 25.7.2.4.1

That's a good point JedClampett - 318 does not include drilled piers/piling. 306.1 does.

Check out Eng-Tips Forum's Policies here:
FAQ731-376: Eng-Tips.com Forum Policies

Red Flag This Post

Please let us know here why this post is inappropriate. Reasons such as off-topic, duplicates, flames, illegal, vulgar, or students posting their homework.

Red Flag Submitted

Thank you for helping keep Eng-Tips Forums free from inappropriate posts.
The Eng-Tips staff will check this out and take appropriate action.

Reply To This Thread

Posting in the Eng-Tips forums is a member-only feature.

Click Here to join Eng-Tips and talk with other members!


Resources