INTELLIGENT WORK FORUMS
FOR ENGINEERING PROFESSIONALS

Log In

Come Join Us!

Are you an
Engineering professional?
Join Eng-Tips Forums!
  • Talk With Other Members
  • Be Notified Of Responses
    To Your Posts
  • Keyword Search
  • One-Click Access To Your
    Favorite Forums
  • Automated Signatures
    On Your Posts
  • Best Of All, It's Free!
  • Students Click Here

*Eng-Tips's functionality depends on members receiving e-mail. By joining you are opting in to receive e-mail.

Posting Guidelines

Promoting, selling, recruiting, coursework and thesis posting is forbidden.

Students Click Here

Jobs

ASME SEC VIII DIV 1 - Cryogenic Tank - Manhole

ASME SEC VIII DIV 1 - Cryogenic Tank - Manhole

ASME SEC VIII DIV 1 - Cryogenic Tank - Manhole

(OP)
ASME SEC VIII double walled vessel with 3m dia and 9m (T-T)vertical tanks, design pressure of 20bar and deign temp of -190oC to +40 oC. & Storage medium liquid nitrogen.

My concern is wheather manhole is required for these tanks.

I have gone through the code and it is not specifically mentioned the Manhole for double wall cryogenic tanks in ASME SEC VIII.

And also i have checked in similar project documents and there also i found there is no manhole is considered for these type of tank.

Please help me to share some lights on this, What is the industrial practice for this type of double walled vessel wheather manhole is required or not and any code requirement?

Thanks in Advance

Red Flag This Post

Please let us know here why this post is inappropriate. Reasons such as off-topic, duplicates, flames, illegal, vulgar, or students posting their homework.

Red Flag Submitted

Thank you for helping keep Eng-Tips Forums free from inappropriate posts.
The Eng-Tips staff will check this out and take appropriate action.

Reply To This Thread

Posting in the Eng-Tips forums is a member-only feature.

Click Here to join Eng-Tips and talk with other members!


Resources