natural gas pipelines facilities design procedure
natural gas pipelines facilities design procedure
(OP)
Hi all, I'm asking if there is a difference between design procedure for piping system which may found inside some industrial facility as oil refinery or petrochemical facility and design procedure of natural gas transmission pipelines facilities as metering stations.
note that, I don't asking about code requirements, I know they will be different in two cases, but I'm asking about the steps of design and the drawings should be made (as PFD, P&ID)
thank you in advance
note that, I don't asking about code requirements, I know they will be different in two cases, but I'm asking about the steps of design and the drawings should be made (as PFD, P&ID)
thank you in advance





RE: natural gas pipelines facilities design procedure
RE: natural gas pipelines facilities design procedure
RE: natural gas pipelines facilities design procedure
RE: natural gas pipelines facilities design procedure
-Pipeline: dP/m (and thus velocity) is the main driver but with an "optimization loop" concerning size (minimizing) and number of pumping/Compressor stations. Also due concerns must be paid to capacity since capacity increase often means a new pipeline
-Plant piping: Velocity (noise and erosion) are the main drivers in most circumstances. Usually dP has less significance then you would think since valves etc accounts for most of the dP. Capacity is often limited by equipment and upgrading piping not _that_ expensive if replacing equipment is considered.