INTELLIGENT WORK FORUMS
FOR ENGINEERING PROFESSIONALS

Log In

Come Join Us!

Are you an
Engineering professional?
Join Eng-Tips Forums!
  • Talk With Other Members
  • Be Notified Of Responses
    To Your Posts
  • Keyword Search
  • One-Click Access To Your
    Favorite Forums
  • Automated Signatures
    On Your Posts
  • Best Of All, It's Free!
  • Students Click Here

*Eng-Tips's functionality depends on members receiving e-mail. By joining you are opting in to receive e-mail.

Posting Guidelines

Promoting, selling, recruiting, coursework and thesis posting is forbidden.

Students Click Here

Jobs

Constructing Pump Stations now for Future Use

Constructing Pump Stations now for Future Use

Constructing Pump Stations now for Future Use

(OP)
I am designing a wastewater conveyance system with a future service area. The proposed system consists of several miles of force main and three pump stations, with zero flow today. Design ADF is about 300,000 GPD, with the largest pump station in the range of 500 GPM. Obviously the system owner has little control over which specific parcels will be developed or when. There is no option which would allow the owner to construct the infrastructure only when demand is present, that discussion has been exhausted and I've been asked to design the system for half of the anticipated build out flow (where the 300,000 GPD came from).

From that standpoint the math is fairly easy. What I'm hoping to get from this post are ideas that I may consider in the design which will allow the owner optimum flexibility with respect to operation throughout the build out of the system. That is, I will include a pad for odor control at some of the stations, but not the odor control system. I will consider control float elevations and arrangements to maximize the flexibility of adjusting the cycle times of the pumps, the largest station will be a triplex station, etc. What other ideas do you suggest I consider in the design?
Thanks in advance.

RE: Constructing Pump Stations now for Future Use

Consider the use of parallel forcemains.

RE: Constructing Pump Stations now for Future Use

(OP)
Thanks bimr, that's essentially what we've done. They understand that if the design flows are realized, a separate force main will be necessary. At this time we are only doing a force main considering half of the design flow. I'm more interested in things that I might consider with respect to the pump stations themselves at this point.

RE: Constructing Pump Stations now for Future Use

The first thing that comes to mind is making sure the wetwells are large enough to accommodate future larger pumps and adequate future storage volume.

RE: Constructing Pump Stations now for Future Use

Did you consider installing pump(s) for current flow (300,000-gpd) and allow for replacement of pump(s) for ultimate flow (500,000-gpd).
Size electrical for ultimate.

Red Flag This Post

Please let us know here why this post is inappropriate. Reasons such as off-topic, duplicates, flames, illegal, vulgar, or students posting their homework.

Red Flag Submitted

Thank you for helping keep Eng-Tips Forums free from inappropriate posts.
The Eng-Tips staff will check this out and take appropriate action.

Reply To This Thread

Posting in the Eng-Tips forums is a member-only feature.

Click Here to join Eng-Tips and talk with other members!


Resources