INTELLIGENT WORK FORUMS
FOR ENGINEERING PROFESSIONALS

Log In

Come Join Us!

Are you an
Engineering professional?
Join Eng-Tips Forums!
  • Talk With Other Members
  • Be Notified Of Responses
    To Your Posts
  • Keyword Search
  • One-Click Access To Your
    Favorite Forums
  • Automated Signatures
    On Your Posts
  • Best Of All, It's Free!

*Eng-Tips's functionality depends on members receiving e-mail. By joining you are opting in to receive e-mail.

Posting Guidelines

Promoting, selling, recruiting, coursework and thesis posting is forbidden.

Jobs

Ventilation for food processing plant

Ventilation for food processing plant

(OP)
I'm doing HVAC design for a new food processing plant. (fish processing and packaging facility)
Is there any specific cfm/p and cfm/sq.ft on ASHRAE 62.1 which I could use for outdoor ventilation.
Since most rooms are refrigerated, it's too costly to overdesign the system. I was told that for food processing, we should go with number of occupants only but I can't see a clause on ASHRAE 62.1 saying that.
Please advise,
Thanks,

RE: Ventilation for food processing plant

Just a thought off the top of my head:

62.1 only requires ventilating spaces that are "occupiable spaces"; the definition of that excluding "those spaces that are intended primarily for other purposes, such as storage rooms and equipment rooms, and that are only occupied occasionally and for short periods of time". In regards to only basing ventilation off occupancy, I just don't feel that makes sense in this situation; the bioeffluents released by the product (fish) are way higher in quantity and concentration than occupants.

Also, when I think foods, I think ASHRAE Handbook: Refrigeration. Have you check there for guidelines?

I hope this gives some direction.

RE: Ventilation for food processing plant

For food processing plants you may find that the amount of point source exhaust and process equipment exhaust will define the amount of fresh air/make-up air required. Consider a heat recovery system if you are in a cold climate. There will also be refrigerant detection and alarming requirements which also may define some amount of emergency standby ventilation. You'll need to be up to speed with your local Workers Compensation Board/OSHA/NIOSH requirements as well as food processing requirements - FDA in the Confused States and CFIA in Canada.

Red Flag This Post

Please let us know here why this post is inappropriate. Reasons such as off-topic, duplicates, flames, illegal, vulgar, or students posting their homework.

Red Flag Submitted

Thank you for helping keep Eng-Tips Forums free from inappropriate posts.
The Eng-Tips staff will check this out and take appropriate action.

Reply To This Thread

Posting in the Eng-Tips forums is a member-only feature.

Click Here to join Eng-Tips and talk with other members!


Resources


Close Box

Join Eng-Tips® Today!

Join your peers on the Internet's largest technical engineering professional community.
It's easy to join and it's free.

Here's Why Members Love Eng-Tips Forums:

Register now while it's still free!

Already a member? Close this window and log in.

Join Us             Close