I have a section 1 pipe, where holes are drilled hill side.
How do i calculate ligament efficiency for this design for calculation of min thickness?
How do i calculate ligament efficiency for this design for calculation of min thickness?





RE: Efficiency of hillside drilled hole
In some cases, it will not matter very much. In others, the two pipes will be a major proportional of the entire wall of the PV.
RE: Efficiency of hillside drilled hole
Hope this helps.