INTELLIGENT WORK FORUMS
FOR ENGINEERING PROFESSIONALS

Come Join Us!

Are you an
Engineering professional?
Join Eng-Tips Forums!
  • Talk With Other Members
  • Be Notified Of Responses
    To Your Posts
  • Keyword Search
  • One-Click Access To Your
    Favorite Forums
  • Automated Signatures
    On Your Posts
  • Best Of All, It's Free!

*Eng-Tips's functionality depends on members receiving e-mail. By joining you are opting in to receive e-mail.

Posting Guidelines

Promoting, selling, recruiting, coursework and thesis posting is forbidden.

Jobs

Lab design and layout

Lab design and layout

(OP)
I am with a new engineering firm and we are moving into new--unused spaces.
I have the opportunity to design the new lab. Although I have been working in this field since Carter was the President, I like to take advantage of the knowledge that others have acquired along the way.
So--if you had the opportunity to design a soils and concrete lab what would you do? How would you lay it out?

We have one room with conditioned air that is 20' X 20'. It needs to hold 5- 8' long tanks for curing concrete cylinders--that pretty much takes up on entire wall. We have double doors at each end roughly on the centerline, dividing the room in half. The tanks are on one side of the pathway between the two sets of double doors. That leaves an entire 20' long wall. I can build a work bench along that wall. The compression machine for cylinder testing is in another room. Space for sieve shakers is also available in another room.

The soils tests to be done in this room are: moisture content ( oven and micro wave), sieves, hydrometer and limits, and Proctors. We may add Specific Gravity testing (ASTM D854) at a later date.

Sample prep and sample storage are also in other spaces.

How would you do it?

Thanks for the help.

RE: Lab design and layout

Can you fit an island bench in the center of the room as well?

You need to consider the expect traffic on the balances. If one person is running a proctor, can someone else be weighing up a gradation at the same time?

Where is the sink? Where are your ovens?

Red Flag This Post

Please let us know here why this post is inappropriate. Reasons such as off-topic, duplicates, flames, illegal, vulgar, or students posting their homework.

Red Flag Submitted

Thank you for helping keep Eng-Tips Forums free from inappropriate posts.
The Eng-Tips staff will check this out and take appropriate action.

Reply To This Thread

Posting in the Eng-Tips forums is a member-only feature.

Click Here to join Eng-Tips and talk with other members!


Resources


Close Box

Join Eng-Tips® Today!

Join your peers on the Internet's largest technical engineering professional community.
It's easy to join and it's free.

Here's Why Members Love Eng-Tips Forums:

Register now while it's still free!

Already a member? Close this window and log in.

Join Us             Close