isolation joint between slab on grade and pits /cable trenches
isolation joint between slab on grade and pits /cable trenches
(OP)
dear engineers
i have seen lots of details of slab on grade and i noticed that there is isolation joint between it and the sump pits ,cable trenches and elevator pits......are these isolation joints mandatory or they are optional??? and why i do it in such places???
have i to make isolation joint between slab on grade and machine/equipment base??? why????
regards
m.samir
i have seen lots of details of slab on grade and i noticed that there is isolation joint between it and the sump pits ,cable trenches and elevator pits......are these isolation joints mandatory or they are optional??? and why i do it in such places???
have i to make isolation joint between slab on grade and machine/equipment base??? why????
regards
m.samir






RE: isolation joint between slab on grade and pits /cable trenches
Dave
Thaidavid