From water electrical engineers point of view, what does ‘Production of MCC/ Control Panel details including ICA information’ mean? Also, could anyone share any useful materials or guides on the design of control panel and MCC in the water industry .
Thank you.
From water electrical engineers point of view, what does ‘Production of MCC/ Control Panel details including ICA information’ mean? Also, could anyone share any useful materials or guides on the design of control panel and MCC in the water industry .
Thank you.






RE: MCC/Control panels in water/wastewater treatment plants.
RE: MCC/Control panels in water/wastewater treatment plants.
"You measure the size of the accomplishment by the obstacles you had to overcome to reach your goals" -- Booker T. Washington
RE: MCC/Control panels in water/wastewater treatment plants.
Instruments, control, automation.
RE: MCC/Control panels in water/wastewater treatment plants.
.
Me wrong? I'm just fine-tuning my sarcasm!
RE: MCC/Control panels in water/wastewater treatment plants.
RE: MCC/Control panels in water/wastewater treatment plants.
In you are in North America, there are NEMA standards for the design and construction of MCCs and in the US, there is UL-845 as the testing authority spec and in Canada it is CSA C22.2 No. 254-05. Control panels in NA typically must be constructed per standards that allow for listing by a "Nationally Recognized Testing Lab" (NRTL), the most well known being UL, and they have a design standard called UL-508A and CSA CSA C22.2 No. 14, both of which are reciprocal. All of those standards dictate the minimum design and performance requirements.
Outside of North America, MCCs are not built by manufacturers so much as they are in NA, they are more often built one-off by independent assembly shops / system integrators, using pre-formatted "systems" from the component manufacturers. Likewise with control panels. I'm not familiar enough with IEC or BS standards to know what they may require, but others here are.