INTELLIGENT WORK FORUMS
FOR ENGINEERING PROFESSIONALS

Log In

Come Join Us!

Are you an
Engineering professional?
Join Eng-Tips Forums!
  • Talk With Other Members
  • Be Notified Of Responses
    To Your Posts
  • Keyword Search
  • One-Click Access To Your
    Favorite Forums
  • Automated Signatures
    On Your Posts
  • Best Of All, It's Free!
  • Students Click Here

*Eng-Tips's functionality depends on members receiving e-mail. By joining you are opting in to receive e-mail.

Posting Guidelines

Promoting, selling, recruiting, coursework and thesis posting is forbidden.

Students Click Here

Jobs

Can replace ASME B 31.4 with ASME B 31.8

Can replace ASME B 31.4 with ASME B 31.8

Can replace ASME B 31.4 with ASME B 31.8

(OP)
Hi Experts,


Plant designed for oil production, GOR is more than 1000, Contractor designed prodction flow line according to ASME B31.8.
pipeline designed to under ground
inlet flow mixed (hydrocarbons,water and gas)

ASME B31.8 Scope statement not to apply liquid petroleum, carbon dioxide and liquified natural gas transportation piping system. old edition

ASME B 31.4 Scope piping transporting liquids such as crude oil, condensate, natural gasoline, natural gas liquids,liquefied petroleum gas, carbon dioxide, and liquid petroleum products between producers' lease facilities, tank farms,natural gas processing plants, refineries, stations, ammonia plants, terminals. new edition.

Can Contractor apply ASME B 31.8 in oil wells between well head and processing plant?

Best Regards

RE: Can replace ASME B 31.4 with ASME B 31.8

Officially no, you can't use B 31.8. See interpretation 16-13 of B 31.8 where it excludes flowlines between wells and separation facilities.

https://www.google.co.uk/url?sa=t&rct=j&q=...


You also shouldn't officially use B 31.4 as it refers to "liquids", not two or three phase fluids.

You should use either B 31.3 or another pipeline code which does cover wellhead to plant.

In reality and as a result of a long standing belief that "gas" wells are covered by B 31.8 and "oil" wells by B 31.4, because no one reads the scope definition many many flowlines are designed to these two codes when they shouldn't have been.....

So can he do it - Yes
Should he do it - No

Remember - More details = better answers
Also: If you get a response it's polite to respond to it.

Red Flag This Post

Please let us know here why this post is inappropriate. Reasons such as off-topic, duplicates, flames, illegal, vulgar, or students posting their homework.

Red Flag Submitted

Thank you for helping keep Eng-Tips Forums free from inappropriate posts.
The Eng-Tips staff will check this out and take appropriate action.

Reply To This Thread

Posting in the Eng-Tips forums is a member-only feature.

Click Here to join Eng-Tips and talk with other members!


Resources