INTELLIGENT WORK FORUMS
FOR ENGINEERING PROFESSIONALS

Log In

Come Join Us!

Are you an
Engineering professional?
Join Eng-Tips Forums!
  • Talk With Other Members
  • Be Notified Of Responses
    To Your Posts
  • Keyword Search
  • One-Click Access To Your
    Favorite Forums
  • Automated Signatures
    On Your Posts
  • Best Of All, It's Free!
  • Students Click Here

*Eng-Tips's functionality depends on members receiving e-mail. By joining you are opting in to receive e-mail.

Posting Guidelines

Promoting, selling, recruiting, coursework and thesis posting is forbidden.

Students Click Here

Jobs

ASME VIII Div 1 and burst disks for two phase flow

ASME VIII Div 1 and burst disks for two phase flow

ASME VIII Div 1 and burst disks for two phase flow

(OP)
Hi

I am working through ASME VIII Div 1 UG-127 and UG-131 to find away to size burst disks for two phase (water and steam) flow. So far I not found any thing on this. Does anyone know where I should be looking?

RE: ASME VIII Div 1 and burst disks for two phase flow

The only reference in ASME VIII-1 I could find is API 527 (see table U-3). If you use API 520-I for your design you're good, as long as you meet the specifici (additional) requirements of VIII-1 (see e.g. UG-137)

RE: ASME VIII Div 1 and burst disks for two phase flow

See if this article from Phil Leckner will answer your query: http://www.cheresources.com/content/articles/safet...

At the bottom of each page there is a drop-down list "More content on this subject..." from where you can chose other parts of the series (there are 6 parts on rupture discs in total).
Most of what is included in this series of articles can be found in API RP520 and API RP521, and ASME Section VIII Division 1. See also https://www.fauske.com/sites/default/files/SizingR...

There is additional information in Lees' "Loss prevention in the process industries", Section 15.

Dejan IVANOVIC
Process Engineer, MSChE

RE: ASME VIII Div 1 and burst disks for two phase flow

(OP)
Thanks XL83NL

I have spent time looking at API520. The problem is, this code under calculates the flows which leads to more disks than you ready need and under calculation of the thrust loads so you will under design the supports at the discharge point.

ISO4123-10 looks promising and closer to what we have measured during commissioning tests.

Red Flag This Post

Please let us know here why this post is inappropriate. Reasons such as off-topic, duplicates, flames, illegal, vulgar, or students posting their homework.

Red Flag Submitted

Thank you for helping keep Eng-Tips Forums free from inappropriate posts.
The Eng-Tips staff will check this out and take appropriate action.

Reply To This Thread

Posting in the Eng-Tips forums is a member-only feature.

Click Here to join Eng-Tips and talk with other members!


Resources