INTELLIGENT WORK FORUMS
FOR ENGINEERING PROFESSIONALS

Log In

Come Join Us!

Are you an
Engineering professional?
Join Eng-Tips Forums!
  • Talk With Other Members
  • Be Notified Of Responses
    To Your Posts
  • Keyword Search
  • One-Click Access To Your
    Favorite Forums
  • Automated Signatures
    On Your Posts
  • Best Of All, It's Free!
  • Students Click Here

*Eng-Tips's functionality depends on members receiving e-mail. By joining you are opting in to receive e-mail.

Posting Guidelines

Promoting, selling, recruiting, coursework and thesis posting is forbidden.

Students Click Here

Jobs

service for trailers

service for trailers

service for trailers

(OP)
Installing 2 trailers; 100 and 200 amp service.
Utilizing a 13.8KV aerial. I assume I can use a 50KA - 13.8-120/240V XFMR. Feed a watt hour meter. Spilt and feed a 100A/SS/FU and a 200A/SS/FU.
What size feeders do I need from the secondary side of the transformer to the meter?

RE: service for trailers

This sounds like a temporary feed for construction trailers??? Usually the utility company will run the secondaries (aerial overhead) to your masthead, so they will size them.

Red Flag This Post

Please let us know here why this post is inappropriate. Reasons such as off-topic, duplicates, flames, illegal, vulgar, or students posting their homework.

Red Flag Submitted

Thank you for helping keep Eng-Tips Forums free from inappropriate posts.
The Eng-Tips staff will check this out and take appropriate action.

Reply To This Thread

Posting in the Eng-Tips forums is a member-only feature.

Click Here to join Eng-Tips and talk with other members!


Resources