INTELLIGENT WORK FORUMS
FOR ENGINEERING PROFESSIONALS

Log In

Come Join Us!

Are you an
Engineering professional?
Join Eng-Tips Forums!
  • Talk With Other Members
  • Be Notified Of Responses
    To Your Posts
  • Keyword Search
  • One-Click Access To Your
    Favorite Forums
  • Automated Signatures
    On Your Posts
  • Best Of All, It's Free!
  • Students Click Here

*Eng-Tips's functionality depends on members receiving e-mail. By joining you are opting in to receive e-mail.

Posting Guidelines

Promoting, selling, recruiting, coursework and thesis posting is forbidden.

Students Click Here

Jobs

Cutout/Boxout for the WC and Clean out in the raft foundation

Cutout/Boxout for the WC and Clean out in the raft foundation

RE: Cutout/Boxout for the WC and Clean out in the raft foundation

So you can pour the concrete without permanently fixing the pipe by bonding to that concrete. The pipe and concrete will expand and move at different rates, which if bonded together, one might damage the other, or initiate cracks in the floor or piping. You won't usually wind up with a liquid tight seal either. AFter the concrete is placed, fill the box with a silicone, etc. type mastic, if desired, to maintain a flexible seal, where the pipe can be pulled and repaired easily at a later date.

RE: Cutout/Boxout for the WC and Clean out in the raft foundation

(OP)
Thank you so much. i convinced our structural engineer to provide the box outs

Red Flag This Post

Please let us know here why this post is inappropriate. Reasons such as off-topic, duplicates, flames, illegal, vulgar, or students posting their homework.

Red Flag Submitted

Thank you for helping keep Eng-Tips Forums free from inappropriate posts.
The Eng-Tips staff will check this out and take appropriate action.

Reply To This Thread

Posting in the Eng-Tips forums is a member-only feature.

Click Here to join Eng-Tips and talk with other members!


Resources