INTELLIGENT WORK FORUMS
FOR ENGINEERING PROFESSIONALS

Log In

Come Join Us!

Are you an
Engineering professional?
Join Eng-Tips Forums!
  • Talk With Other Members
  • Be Notified Of Responses
    To Your Posts
  • Keyword Search
  • One-Click Access To Your
    Favorite Forums
  • Automated Signatures
    On Your Posts
  • Best Of All, It's Free!

*Eng-Tips's functionality depends on members receiving e-mail. By joining you are opting in to receive e-mail.

Posting Guidelines

Promoting, selling, recruiting, coursework and thesis posting is forbidden.

Jobs

unit hydrograph

unit hydrograph

(OP)
i want to find unit hydrograph for the storm of 500 year return period (which rainfall is 10 inch).i use "curvilinear dimensionless unit hydrograph" and find the discharge.which is 128000 cusec. but when i put the same parameter in hec hms the result is only 40000 cusec discharge. i tried many other data. but the same result come.i.e peach discharge of curvilinear dimensionless unit hydrograph method is too much as compared to hem hms. can any one help me in this regard

RE: unit hydrograph

Based on your post, it appears that you may be manually applying the entire rainfall to the dimensionless unit hydrograph (UH), which is incorrect. There are actually two different curves involved: The UH and the temporal rainfall distribution. The rainfall distribution determines how the rainfall is distributed over time, and specifies the magnitude and timing of the peak rainfall. The UH represents the runoff from a single burst of rainfall of relatively short duration (related to the Tc). To generate a runoff hydrograph, the rainfall is divided into bursts of equal duration, the (SCS) runoff equation is used to determine the volume of runoff for each burst, and the UH is used to generate a runoff hydrograph for each burst. Adding all the individual hydrographs gives the total runoff. As such, the peak runoff is dependent on the characteristics of the UH and the rainfall distribution. Performing this calculation by hand is a non-trivial process.



Peter Smart
HydroCAD Software
www.hydrocad.net

RE: unit hydrograph

There may be other issues, but using a 1-hour time step is going to significantly understate the peak rainfall compared to the 1/10 hour time step commonly used. Even with your fairly long Tc of 1.22 hrs I wouldn't use a time step of more than 1/2 hour.

Retract that - I overlooked the fact that you're using a 6-hour storm, so the time increment may be OK.

HOWEVER, the peak runoff for a 6-hour Type II storm should be roughly between 3 and 4 hours - not 15 hours as shown in your calculations. I would recheck the spreadsheet.

Peter Smart
HydroCAD Software
www.hydrocad.net

Red Flag This Post

Please let us know here why this post is inappropriate. Reasons such as off-topic, duplicates, flames, illegal, vulgar, or students posting their homework.

Red Flag Submitted

Thank you for helping keep Eng-Tips Forums free from inappropriate posts.
The Eng-Tips staff will check this out and take appropriate action.

Reply To This Thread

Posting in the Eng-Tips forums is a member-only feature.

Click Here to join Eng-Tips and talk with other members!


Resources


Close Box

Join Eng-Tips® Today!

Join your peers on the Internet's largest technical engineering professional community.
It's easy to join and it's free.

Here's Why Members Love Eng-Tips Forums:

Register now while it's still free!

Already a member? Close this window and log in.

Join Us             Close