INTELLIGENT WORK FORUMS
FOR ENGINEERING PROFESSIONALS

Log In

Come Join Us!

Are you an
Engineering professional?
Join Eng-Tips Forums!
  • Talk With Other Members
  • Be Notified Of Responses
    To Your Posts
  • Keyword Search
  • One-Click Access To Your
    Favorite Forums
  • Automated Signatures
    On Your Posts
  • Best Of All, It's Free!
  • Students Click Here

*Eng-Tips's functionality depends on members receiving e-mail. By joining you are opting in to receive e-mail.

Posting Guidelines

Promoting, selling, recruiting, coursework and thesis posting is forbidden.

Students Click Here

Jobs

Bending Flexural Vertical Bars in Stem of Retaining Walls after concrete has been placed

Bending Flexural Vertical Bars in Stem of Retaining Walls after concrete has been placed

Bending Flexural Vertical Bars in Stem of Retaining Walls after concrete has been placed

(OP)
When is it appropriate and not appropriate to bend reinforcement?

Currently, looking into some vertical (flexural) bars in the stem of a retaining wall that have already been placed in the concrete footing. The vertical (flexural) bars were placed 1 inch from where they were supposed to be, which was 3 inches from the earth face of the wall. Would it be appropriate/acceptable to bend these bars that were placed 4 inches from the earth face of the wall, 1 inch horizontally within say 4 inches in height?

Thanks

RE: Bending Flexural Vertical Bars in Stem of Retaining Walls after concrete has been placed

It would not be acceptable. The effective depth to your bars would still be controlled by where they are located at the top of the footing.

As to when and how it is acceptable to bend bars, that varies with the situation.

RE: Bending Flexural Vertical Bars in Stem of Retaining Walls after concrete has been placed

(OP)
Yes, I agree that the effective depth to the vertical bars is still controlled by where they are located a the top of the footing.

But, was trying to get some guidance regarding the strength of the vertical bar if it is bend after it has already been placed in the concrete footing of the wall. By bending the bar, am I decreasing the strength? And if so, would this decrease in strength of the bar still acceptable?

Thanks

RE: Bending Flexural Vertical Bars in Stem of Retaining Walls after concrete has been placed

I'd consider bending (only once at any bend location) of bars already in place to be acceptable with no loss of capacity. Some concrete spalling at the concrete construction joint is to be expected.

Professional and Structural Engineer (ME, NH, MA)
American Concrete Industries
www.americanconcrete.com

RE: Bending Flexural Vertical Bars in Stem of Retaining Walls after concrete has been placed

The question here is not so much the cover, as the decrease in the developed bending moment at the very base of the wall section. For an 8" wall where the steel was supposed to be at 3" from the vertical face (1.5" to 2" would be normal except for a footing bottom), the reduction in the developed bending moment simplistically would be 16/25 or about 2/3.

Perhaps that is good enough, but the engineer of record should confirm that is OK.

Mike McCann, PE, SE (WA)


RE: Bending Flexural Vertical Bars in Stem of Retaining Walls after concrete has been placed

After reading the article JAE provided, I noticed ACI 318's commentary is not consistent with ACI 301-10's requirements for field bending and straightening in section 3.3.2.8. ACI 301 requires preheat for bars larger than #5.

Red Flag This Post

Please let us know here why this post is inappropriate. Reasons such as off-topic, duplicates, flames, illegal, vulgar, or students posting their homework.

Red Flag Submitted

Thank you for helping keep Eng-Tips Forums free from inappropriate posts.
The Eng-Tips staff will check this out and take appropriate action.

Reply To This Thread

Posting in the Eng-Tips forums is a member-only feature.

Click Here to join Eng-Tips and talk with other members!


Resources