INTELLIGENT WORK FORUMS
FOR ENGINEERING PROFESSIONALS

Log In

Come Join Us!

Are you an
Engineering professional?
Join Eng-Tips Forums!
  • Talk With Other Members
  • Be Notified Of Responses
    To Your Posts
  • Keyword Search
  • One-Click Access To Your
    Favorite Forums
  • Automated Signatures
    On Your Posts
  • Best Of All, It's Free!
  • Students Click Here

*Eng-Tips's functionality depends on members receiving e-mail. By joining you are opting in to receive e-mail.

Posting Guidelines

Promoting, selling, recruiting, coursework and thesis posting is forbidden.

Students Click Here

Jobs

Collector Callout

Collector Callout

Collector Callout

(OP)
I have a shearwall abutting into a floor and need to have a collector installed (ie. full depth blocking and cont. strap). What would be a typical call out for this? Strangely I've never had to call one of these out before, I've usually had interior shearwalls with drag trusses, but this time I've got a lower shearwall that is perp. to the floor trusses and there is no connecting diaphragm directly above it.

A confused student is a good student.
Nathaniel P. Wilkerson, PE
www.medeek.com

RE: Collector Callout

I'd just cut the sections and detail what you need. Avoid "collector" term.
Over-detail the conditions the framers aren't used to.

Red Flag This Post

Please let us know here why this post is inappropriate. Reasons such as off-topic, duplicates, flames, illegal, vulgar, or students posting their homework.

Red Flag Submitted

Thank you for helping keep Eng-Tips Forums free from inappropriate posts.
The Eng-Tips staff will check this out and take appropriate action.

Reply To This Thread

Posting in the Eng-Tips forums is a member-only feature.

Click Here to join Eng-Tips and talk with other members!


Resources