Fastener assembly placing 96 joints take too much time, is it normal? NX10/TC10
Fastener assembly placing 96 joints take too much time, is it normal? NX10/TC10
(OP)
Placing 96 fastener assemblies took little less than a hour, then changing properties for washers in top stack took more than hour and a half, is that normal?
If not normal (and I am very much sure it is not normal) what can be a cause of long time?
If not normal (and I am very much sure it is not normal) what can be a cause of long time?
_____________________________
Enjoy your work and have fun!





RE: Fastener assembly placing 96 joints take too much time, is it normal? NX10/TC10
RE: Fastener assembly placing 96 joints take too much time, is it normal? NX10/TC10
RE: Fastener assembly placing 96 joints take too much time, is it normal? NX10/TC10
So that is good and bad in same time. Good that it is not me making some stupid mistake, bad is that I would really like to have constrains on it, but with this amount of time used to place them with constrains I think I will skip them too. But it is minus for project.
_____________________________
Enjoy your work and have fun!