STEAM CONDENSER PACAKGE RFQ
STEAM CONDENSER PACAKGE RFQ
(OP)
Hello all,
Has any one experience with RFQ package of STEAM CONDENSER? can some one share this package for my refrence on my email -id - ias2007@yahoo.com.au
Has any one experience with RFQ package of STEAM CONDENSER? can some one share this package for my refrence on my email -id - ias2007@yahoo.com.au





RE: STEAM CONDENSER PACAKGE RFQ
Which side of this are you on, are you buying or building?
= = = = = = = = = = = = = = = = = = = =
P.E. Metallurgy, Plymouth Tube
RE: STEAM CONDENSER PACAKGE RFQ
RE: STEAM CONDENSER PACAKGE RFQ
I would suggest that you read through it, and then look at a package for an existing plant.
You will see some things that they added, and some that you wish had been included.
At its most basic all that you provide is inputs, steam flow and enthalpy, water flow available and seasonal temperature information. While that is technically enough you will want to spec a lot more.
= = = = = = = = = = = = = = = = = = = =
P.E. Metallurgy, Plymouth Tube
RE: STEAM CONDENSER PACAKGE RFQ
The buyer must completely describe his various thermal conditions (from a detailed heat balance); his steam and cooling water purity as well as the geometry of matching machinery. Design flow rates, vacuum conditions, etc must be decided by a detailed study of plant economics as well as performance limitations of adjoining equipment.
The buyer must describe and be knowledgeable of "off design" and emergency conditions such as steam dump
The buyer must select tube materials....
Steam surface condensers are huge and expensive machines that can strongly affect plant economics ..... if you have never specified one before, consider hiring a consultant for this important task....
MJCronin
Sr. Process Engineer
RE: STEAM CONDENSER PACAKGE RFQ
RE: STEAM CONDENSER PACAKGE RFQ
RE: STEAM CONDENSER PACAKGE RFQ
CR
"As iron sharpens iron, so one person sharpens another." [Proverbs 27:17, NIV]