INTELLIGENT WORK FORUMS
FOR ENGINEERING PROFESSIONALS

Log In

Come Join Us!

Are you an
Engineering professional?
Join Eng-Tips Forums!
  • Talk With Other Members
  • Be Notified Of Responses
    To Your Posts
  • Keyword Search
  • One-Click Access To Your
    Favorite Forums
  • Automated Signatures
    On Your Posts
  • Best Of All, It's Free!
  • Students Click Here

*Eng-Tips's functionality depends on members receiving e-mail. By joining you are opting in to receive e-mail.

Posting Guidelines

Promoting, selling, recruiting, coursework and thesis posting is forbidden.

Students Click Here

Jobs

Foundation Repair

Foundation Repair

RE: Foundation Repair

Heck, I'd drill some holes into the old and insert re-bars, maybe epoxied in. Then form it up along with the new wall forms and fill the zone along with pouring the new wall for the Bilco. The re-bars will serve to hold the new wall from leaning in, so they should be well secured into the old and a "L" on the exposed ends to tie into the new wall concrete. If there had been no such opening one would dowel into the old there anyway.

RE: Foundation Repair

Is this in cold country? I did the same Bilco door installation but sawed the old for a clean cut. I insulated under a slab and set the walls on that, with insulation on their exterior. It gets cold inside that enclosure.

Red Flag This Post

Please let us know here why this post is inappropriate. Reasons such as off-topic, duplicates, flames, illegal, vulgar, or students posting their homework.

Red Flag Submitted

Thank you for helping keep Eng-Tips Forums free from inappropriate posts.
The Eng-Tips staff will check this out and take appropriate action.

Reply To This Thread

Posting in the Eng-Tips forums is a member-only feature.

Click Here to join Eng-Tips and talk with other members!


Resources