INTELLIGENT WORK FORUMS
FOR ENGINEERING PROFESSIONALS

Log In

Come Join Us!

Are you an
Engineering professional?
Join Eng-Tips Forums!
  • Talk With Other Members
  • Be Notified Of Responses
    To Your Posts
  • Keyword Search
  • One-Click Access To Your
    Favorite Forums
  • Automated Signatures
    On Your Posts
  • Best Of All, It's Free!
  • Students Click Here

*Eng-Tips's functionality depends on members receiving e-mail. By joining you are opting in to receive e-mail.

Posting Guidelines

Promoting, selling, recruiting, coursework and thesis posting is forbidden.

Students Click Here

Jobs

Mock Up Testing of Tube To Tube sheet

Mock Up Testing of Tube To Tube sheet

Mock Up Testing of Tube To Tube sheet

(OP)
Hello, When really Mock Up Testing of Tube To Tubesheet Joint really make sense? Does it add value to do it for each heat exchanger?

RE: Mock Up Testing of Tube To Tube sheet

If the joints will only be rolled I would require one every time.
It must be made to the original specifications, have 'original' tubes installed and then removed, and then the new tubes installed.
How else would you know what rolling torque to use and how tight the joints are?
If you are strength welding people often only do them if they need to qualify the weld procedure (or operator).
If you are seal welding it often comes down to how critical the service is, they are still done regularly.
Ask your re-tubing company what their practice is.

= = = = = = = = = = = = = = = = = = = =
P.E. Metallurgy, Plymouth Tube

RE: Mock Up Testing of Tube To Tube sheet

Yes.

RE: Mock Up Testing of Tube To Tube sheet

yaar123. Your HE has 100, 1000 or more tubes?, hence consider the risk of possible quantity of leaks and repairs that can be avoided.

Regards
r6155

RE: Mock Up Testing of Tube To Tube sheet

The last - and only - time that a mock up tube to tube sheet joint sample and pull test were mandated by one of my clients was when there was uncertainty regarding the optimization between tube wall thickness reduction and the corresponding mechanical strength of the joint. In this instance, the tubes were 410 stainless steel and the concern was that the vendor's tube rolling procedure in their ITP still proposed 8% to 12% wall reduction as would have been the case with SA-179. Martensitic steel was considered more prone to work hardening, so a mock-up was made of the assembly using surplus materials from the same heats as would be used in fabrication for both the tubes and the tube sheet, and the same tube hole tolerances and grooves. 9 tubes were rolled to various wall thickness reductions and it was shown in the subsequent pull tests that the optimum point in that instance was closer to 5%, which is what was then imposed in the ensuing fabrication.

RE: Mock Up Testing of Tube To Tube sheet

I forgot to mention, my experience is with stainless steels and Ni alloys, where mock-ups are very common.

= = = = = = = = = = = = = = = = = = = =
P.E. Metallurgy, Plymouth Tube

Red Flag This Post

Please let us know here why this post is inappropriate. Reasons such as off-topic, duplicates, flames, illegal, vulgar, or students posting their homework.

Red Flag Submitted

Thank you for helping keep Eng-Tips Forums free from inappropriate posts.
The Eng-Tips staff will check this out and take appropriate action.

Reply To This Thread

Posting in the Eng-Tips forums is a member-only feature.

Click Here to join Eng-Tips and talk with other members!


Resources