gravity fluid feed to an underground mine down a vertical mineshaft.
gravity fluid feed to an underground mine down a vertical mineshaft.
(OP)
I'm looking for some hydraulic flowrate help with a problem that I'm trying to solve.
The problem is that a fluid of 1.24 specific gravity, has to be delivered down a mine shaft which is 3,300 feet deep, but I don't want to build any static head in the pipe. Therefore, it needs to be designed as a free flowing 'drain-pipe', with the top open to the atmosphere. The flowrate is 1,250 USgpm. This is well beyond any plumbing formula for rainwater down-comers.
Does anyone have any idea what formula would apply to such a massive 'free-fall' of liquid, so that the pipe can be sized. Also, what would the terminal velocity of the fluid be inside of the pipe. I might put a turbine in the pipeline after some later thought, but that is not the current issue.
Any help will be appreciated.
thanks,
ECD40
The problem is that a fluid of 1.24 specific gravity, has to be delivered down a mine shaft which is 3,300 feet deep, but I don't want to build any static head in the pipe. Therefore, it needs to be designed as a free flowing 'drain-pipe', with the top open to the atmosphere. The flowrate is 1,250 USgpm. This is well beyond any plumbing formula for rainwater down-comers.
Does anyone have any idea what formula would apply to such a massive 'free-fall' of liquid, so that the pipe can be sized. Also, what would the terminal velocity of the fluid be inside of the pipe. I might put a turbine in the pipeline after some later thought, but that is not the current issue.
Any help will be appreciated.
thanks,
ECD40





RE: gravity fluid feed to an underground mine down a vertical mineshaft.
Mike Halloran
Pembroke Pines, FL, USA
RE: gravity fluid feed to an underground mine down a vertical mineshaft.
... yes, lining the shaft, all the way down.
Mike Halloran
Pembroke Pines, FL, USA
RE: gravity fluid feed to an underground mine down a vertical mineshaft.
For self venting flow at 1250 USgpm you would require a diameter of 18" or larger. The flow that would result in the friction exactly matching the static head would depend weakly on the viscosity, but assuming a viscosity of 5 cP gives a diameter of 3.9" (99 mm). Any size between these extremes would result in various degrees of gurgling, slugging and pressure build up.
There was a looong discussion on this way back in thread378-81608: Diesel fuel flow through a vertical pipe
Katmar Software - AioFlo Pipe Hydraulics
http://katmarsoftware.com
"An undefined problem has an infinite number of solutions"
RE: gravity fluid feed to an underground mine down a vertical mineshaft.
You need though to give us a bit more data.
Truly vertical?
What is happening at the bottom? - You will only be able to stop flow at the top and let the contents continue to pour out with an air gap into a pond or tank. Any attempt to stop flow at the bottom will build up a considerable pressure very quickly so this open end will need to be absolutely guaranteed - can you do this?
What level of pressure can you stand?
Some sort of multiple sections or zig zags will break up the flow and reduce velocity. I find it difficult to work out for any vertical system how you would start / stop / commission this system without the first fluid not achieving free fall velocities of probably hundreds of metres a second at the bottom with consequencial huge impact forces.
A sectional diagram or a bit more info would be good.
Remember - More details = better answers
Also: If you get a response it's polite to respond to it.
RE: gravity fluid feed to an underground mine down a vertical mineshaft.
But when liquid flows at these rates then bends need to be thoroughly anchored. The mechanical aspects are much more difficult to design than the hydraulics. Definitely no valves in the line (other than the very beginning) and the best way to do it is to charge a small tank on the surface with the quantity you need to transfer, and then just drain the full contents to the underground tank and avoid the need to stop the flow.
Katmar Software - AioFlo Pipe Hydraulics
http://katmarsoftware.com
"An undefined problem has an infinite number of solutions"
RE: gravity fluid feed to an underground mine down a vertical mineshaft.
A series of cascades might be a lot easier??
Why not use a steel pipe or even a small diameter high pressure flexible. 1000m at 1.24SG is only 125barg. Not really that high in small bore pipe terms?
Remember - More details = better answers
Also: If you get a response it's polite to respond to it.
RE: gravity fluid feed to an underground mine down a vertical mineshaft.
The thread referred to regarding diesel delivery down a shaft or decline is common to all underground mines and they operate with no problem as a 'drainpipe', vented to atmosphere and discharging into a holding tank. Normally, the pipe size is no larger than a 2" schedule 80 steel pipe.
In my case, the volume of fluid is huge, the mine shaft is vertical and it already exists, therefore the pipe will be vertical. The hydraulics should be the same or similar to a rainwater downcomer, open at the top and discharging to atmosphere or into a holding tank with little or no back-pressure. There will be no 'water-hammer' effect by design. When we 'pour' the fluid into the open topped vertical pipe, it will accelerate to some terminal velocity and break-up into streams and droplets. The pipe discharge can be submerged in the underground receiving atmospheric pressure tank, so that no head will build up in the pipe.
If you think of your house rainwater downcomers in a heavy storm, the eaves-troughs can be overflowing, because the downcomer entry is overloaded and submerged, but the discharge pipe is still not running full at the exit. I think that this is where 'normal' hydraulic formulae do not apply, as we do not have a full pipe flow to which Bernoulli et al's formulae apply.
So this is the dilemma and challenge - what formula does apply to free fall liquids in a vertical pipe? The plumbing codes don't even come close to these kinds of volumes. With a mineshaft at 3,300 feet deep, I cannot afford to have the wrong size pipe installed. I only have one good shot at getting this right, as it will cost $$millions to install the pipe(s) in the shaft - right size or wrong size!
All further thoughts and comments will be appreciated.
Thanks,
ECD40
RE: gravity fluid feed to an underground mine down a vertical mineshaft.
Katmar Software - AioFlo Pipe Hydraulics
http://katmarsoftware.com
"An undefined problem has an infinite number of solutions"
RE: gravity fluid feed to an underground mine down a vertical mineshaft.
you need to avoid bubble and slug flow and probably stick with annular flow
http://www.tandfonline.com/doi/pdf/10.1080/1881124...
RE: gravity fluid feed to an underground mine down a vertical mineshaft.
http://www.eng-tips.com/viewthread.cfm?qid=326191
RE: gravity fluid feed to an underground mine down a vertical mineshaft.
If I were to try to determine an answer to your query , I would want to know EXACTLY what your liquid at 1.24 SG is. It sounds like hydraulic backfill , and once again , weird things happen when moving hyd fill.. both vertically and horizontally.
Personaly I'd be very nervous extrapolating diesel fuel calculations into this scenario.
RE: gravity fluid feed to an underground mine down a vertical mineshaft.
If this fluid contains solid particles then the velocities required to achieve a zero pressure gradient become a concern for erosion.
Katmar Software - AioFlo Pipe Hydraulics
http://katmarsoftware.com
"An undefined problem has an infinite number of solutions"
RE: gravity fluid feed to an underground mine down a vertical mineshaft.
To Katmar. When we send diesel fuel down the mine, it goes in batches. The pipeline is not allowed to contain a column of fuel by code, so the hydraulics are similar to a rainwater leader - ie., open on the top and bottom so that its a straight through flow. The pipe is therefore running only part full in the cross section. The time it takes for the diesel fuel to run down the pipe in batches is not important.
To Miningman. Your comments would apply to running the pipe full, but that will pressurize the line by whatever head builds up. That is what I'm trying to avoid by treating the line as a drainpipe or rainwater leader. The SG is very high but it's not backfill. I'm not at liberty to reveal exactly what I'm doing yet, as the project is very confidential. I'll reveal more as time goes on.
To bimr. Thanks for that reference regarding the diesel flow. For the benefit of all, I'm copying what you said elsewhere regarding the work done by Dawson and Kalinske - as follows:-
[If you desire to limit the terminal velocity, then you need to limit the flow of fluid into the pipe since the terminal velocity is related to fluid flow.
In a report done by Dawson and Kalinske - "Report of Hydraulics and Pneumatics of Plumbing Drainage Systems' they developed the formulae. The terminal velocity is related to fluid flow and diameter according to the equation:
Vt = 3.0 (q/d)^(2/5) and
Lt = 0.05(Vt)^2
Where Vt is terminal water velocity (fps), and Lt is the developed length to develop terminal velocity (ft). From these formulae it was determined for various standard pipe sizes terminal velocity is about 10-15 fps, and that this velocity is achieved within 10-15 feet of fall.
What this means is that the velocity of falling fluid is about the same regardless if it is falling 2-3 stories, or 100 stories.]
The terminal velocity of 10 - 15 fps is more than where the IAMPO flowrates settle in.
To all. I've pursued the rainwater analogy idea and found what seems to be a reasonable approximation to the issue with the pipe in the mineshaft (see attachment). The pipe does not run full as the fluid is in 'free fall' within the pipe, but neither can it reach the 'free fall' terminal velocity of an unconstrained fall. (Note that much of the fluid will be running down the walls of the pipe as well as away from the walls). According to the source, which is IAMPO, an 8" diameter vertical pipe can carry 913 USgpm. By extrapolation, 1,250 USgpm requires between an 8" and 10" diameter pipeline, running at 7/24th full. In the above Dawson and Kalinski formula the units are inches of pipe diameter and USgpm for fluid flow. I've tried the Dawson and Kalinski formula, but have not yet reconciled the two sources. Maybe there is a problem between the Dawson and Kalinski work (University of Iowa Studies - Bulletin 10 - Report on Hydraulics and Pneumatics of Plumbing Drainage Systems - 1937) and what I'm trying to do. Their lab test pipe was 30 feet long - mine is 3,300 feet long, so the hydraulic results can vary considerably.
Is it possible that the Coriolis effect can make a difference in fluid flowrate by sending the fluid to the pipe wall on a long vertical pipe run?
So I'm still struggling to find the 'correct' and minimum size of pipe to do the job.
Thanks for your continuing comments and valued input.
ECD40
RE: gravity fluid feed to an underground mine down a vertical mineshaft.
RE: gravity fluid feed to an underground mine down a vertical mineshaft.
Thanks for your comments, but the fluid is neither diesel oil nor backfill (from a previous comment by miningman). The continuous fluid flowrate is 1,250 USgpm with an SG of 1.24 and the vertical pipeline in the shaft is 3,300 feet long.
I've yet to find any similar installation nor any hydraulic formula that properly covers this application.
Nevertheless, I have to install a pipeline that has to be 'fit for purpose'.
So I'm still struggling with this problem.
Regards to all,
ECD40
RE: gravity fluid feed to an underground mine down a vertical mineshaft.
Whatever size you choose it will be wrong - that's pipeline type engineering for you.
You need to move away from the data gathering and look at what really matters I think.
What is it you really really need to achieve? Is it a flow of 1250 gpm or greater? Is it lowest cost but somewhere >1000 gpm will suffice? Is it smallest size because installation cost is everything?
The physics of this are that for a full pipe with pressure drop equal to frictional drop then you're looking at a 4" pipe with velocity about 30 fps according to mining man and katmar - Seems right to me. The trick here will be how you stat and stop the flow, but otherwise you have a good answer here which is clearly the most efficient use of pipe. If you get it just right then there will be no build up of pressure as the friction equals the head loss. To start it from empty you might be able to use something like a foam pig and then release it with a full pipe and a tank full on top of your fluid. If it's a decent fit the pig will seal the fluid and fall a the same speed. You need to think how you're going to deal with a foam bullet travelling at 30 fps, but I'm sure you'll figure it out.
At the other extreme you have a pipe diameter of somewhere between 18" and 10" based on "free fall" flow with not all the pipe being used. This will also introduce a LOT of air into your fluid and you need to think about what is happening at the bottom to be able to vent all this air caught up in your fluid which is hurtling down your pipe.
Anything less than 10" or more than 4" and you're into a complex world of slugging, surging and air fighting to go one way while your fluid is trying to go another. Getting any idea of what is going to happen will need some pretty nifty transient analysis tools which are normally designed for fluid going up from oil wells, not down into the ground.
So "I've yet to find any similar installation nor any hydraulic formula that properly covers this application." - well this tells you something - it probably doesn't exist, at least on a steady state formula or graph based solution - too much is going on to do this.
Yo could look at multiple small tubes inside say a 6" pipe and gradually use them in full mode one by one until you hit your flow rate? They run tubes much longer into oil wells so it's easy to add another coiled tube if you don't have the flow.
Let us know what you decide.
Remember - More details = better answers
Also: If you get a response it's polite to respond to it.
RE: gravity fluid feed to an underground mine down a vertical mineshaft.
I think I would enjoy the mental challenges of being part of a multi disiplinary team working on this problem, but again Little inch is right , eventually somebody is going to have to spend serious construction money in order to evaluate how good the engineering is.
RE: gravity fluid feed to an underground mine down a vertical mineshaft.
RE: gravity fluid feed to an underground mine down a vertical mineshaft.
RE: gravity fluid feed to an underground mine down a vertical mineshaft.
I have a big problem with no easy solution.
Maybe I had better have another look at the turbine option, with the 3,300 feet of head at 1.24 SG and 1,250 USgpm continuous flowrate. A Pelton turbine may do the job. Any thoughts on this?
Thanks,
ECD40
(I'll be off-line until mid next week.)
RE: gravity fluid feed to an underground mine down a vertical mineshaft.
RE: gravity fluid feed to an underground mine down a vertical mineshaft.
The fluid is clear with zero solids and still has an SG of 1.24. No abrasion on any rotating machinery.
regards,
ECD40
RE: gravity fluid feed to an underground mine down a vertical mineshaft.
For a turbine to do any useful work to generate electricity you need the biggest pipe you can get and have a high pressure at the bottom of your pipe which you said you didn't want...
A great way of getting free electricity, but needs more capex.
Remember - More details = better answers
Also: If you get a response it's polite to respond to it.
RE: gravity fluid feed to an underground mine down a vertical mineshaft.
Is there a complementary flow of 'spent' fluid that has to go up the shaft? That might make a bucket/chain conveyor, or a pump driven by the turbine, attractive.
Mike Halloran
Pembroke Pines, FL, USA
RE: gravity fluid feed to an underground mine down a vertical mineshaft.
RE: gravity fluid feed to an underground mine down a vertical mineshaft.
The turbine option was mentioned in my opening statement on June 8. It is an option to the 'drainpipe'.
Yes, the fluid would now have to run as a full pipe, and the familiar hydraulic formulae apply. The pipe wall at shaft top would be schedule 80 increasing to schedule 160 by the time the pipe reached the shaft bottom. We anchor these pipes to the shaft wall at every 20 feet or so. The turbine would be located at a mine level off the shaft, so no problem there.
The static pressure in the pipe would be about 2,500 psi. Quite different to the 'drainpipe' alternative and schedule 40 pipe.
Preliminary calculations indicate that there could be about 8 MW of power available, so it's nothing to sneeze at, but it will take a lot more Capex, but with a credit towards the Opex.
The spent fluid does indeed have to be disposed of, but that is also true in the case with the drainpipe. The disposal is a different problem that I may ask for your comments at a later date.
Talk to you next week.
Thanks again,
ECD40
RE: gravity fluid feed to an underground mine down a vertical mineshaft.
Katmar Software - AioFlo Pipe Hydraulics
http://katmarsoftware.com
"An undefined problem has an infinite number of solutions"
RE: gravity fluid feed to an underground mine down a vertical mineshaft.
Remember - More details = better answers
Also: If you get a response it's polite to respond to it.
RE: gravity fluid feed to an underground mine down a vertical mineshaft.
33 x 41 x 1.24 or 1680psi, not 2500psi. But the thing that really puzzles me , is how do we then dispose of the fluid at the bottom of the shaft?? Unless it is a volatile liquid that could go out in the ventilation air ( and thats totally ignoring safety issues) I hope no one is going to suggest it gets pumped back to surface!!
RE: gravity fluid feed to an underground mine down a vertical mineshaft.
Remember - More details = better answers
Also: If you get a response it's polite to respond to it.
RE: gravity fluid feed to an underground mine down a vertical mineshaft.
Katmar Software - AioFlo Pipe Hydraulics
http://katmarsoftware.com
"An undefined problem has an infinite number of solutions"
RE: gravity fluid feed to an underground mine down a vertical mineshaft.
I look forward to the OP providing these details because working in shafts is my bread and butter, and I might just learn something here if the OP is onto something totally new.
RE: gravity fluid feed to an underground mine down a vertical mineshaft.
I've been off-line for a while, but still working on the problems.
If the fluid, which I can advise you now is saturated brine with an SG of 1.24, goes underground in a 'drainpipe or rain-leader' type flow, we will need a 10" diameter pipe. This is in accordance with the Uniform Plumbing Code, that considers that the pipe is only using 7/24th. of the total cross section. There will be no static head build up at the shaft bottom, as the fluid would discharge through the open ended pipe. The terminal velocity of the fluid in the pipe will be about 10 feet/sec., but running along the pipe wall.
However, this does not give us any benefit of energy recovery from the 3,300 feet elevation change. If we add a Pelton wheel turbine at the shaft bottom, we can take advantage of the full potential static head by running the pipe full. Of course, the pipe wall thickness required for each option will be different, due to the great differences in static head. The economics of each will need to be calculated before a final selection can be made.
So to go back to my original request for help/information, the Uniform Plumbing Code adequately addresses the 'free fall flow' of water in a vertical pipe, which in this case indicates a 10" diameter pipe. I checked with some hard rock mines with deep shafts, that use a lot of water for drilling, and they use the 'drainpipe' type flow for transferring water to the underground.
The Pelton wheel turbine option still needs some investigation, but the power generated may be a lot less than I had hoped for, so it may go nowhere.
Regarding what will we do with the saturated brine that we sent down the shaft - well that's a different part of the project.
Thanks for all of your help and good comments along the way. I don't know how long this thread remains active, but I'll try to give you an update when the engineering has progressed further and the project confidentiality can be relaxed a little.
Regards to all,
ECD40
RE: gravity fluid feed to an underground mine down a vertical mineshaft.
Terminal velocity of 3m/sec looks a little low to me, but if it's discharging into an air gap above a tank, maybe doesn't matter so much.
To get something useful for your energy recovery, I guess you want to restrict your friction losses in your pipe to about 10% max of the total head loss, so in your case 300ft of friction losses to calculate the required pipe size.
Remember - More details = better answers
Also: If you get a response it's polite to respond to it.
RE: gravity fluid feed to an underground mine down a vertical mineshaft.
RE: gravity fluid feed to an underground mine down a vertical mineshaft.
RE: gravity fluid feed to an underground mine down a vertical mineshaft.