Dear Gentlemen
Here we have a problem ,we are going to weld a 19 mm carbon steel flange hub, with 3 mm inconel 625 overlay ,to a 14 mm Solid inconel pipe, Executing team has presented a plan to build up the pipe with 8 mm inconel and then start welding. On the other hand, we have no free space for using transition piece.

ASME B31.3 Code book recommends using transition piece for this case{Fig 328.3.2(a)}but we have no more room, Then mentioned procedure is not supported by ASME B31.3 Code book,
There are 90 joints like this on each deck and pipe service is sour gas and I don’t feel good about thickness build up .
I appreciate if you let me know your opinion.
Regards
Amir Rokhsativand
Piping Engineer
Here we have a problem ,we are going to weld a 19 mm carbon steel flange hub, with 3 mm inconel 625 overlay ,to a 14 mm Solid inconel pipe, Executing team has presented a plan to build up the pipe with 8 mm inconel and then start welding. On the other hand, we have no free space for using transition piece.

ASME B31.3 Code book recommends using transition piece for this case{Fig 328.3.2(a)}but we have no more room, Then mentioned procedure is not supported by ASME B31.3 Code book,
There are 90 joints like this on each deck and pipe service is sour gas and I don’t feel good about thickness build up .
I appreciate if you let me know your opinion.
Regards
Amir Rokhsativand
Piping Engineer





RE: Thickness Build up
Looks rather odd, but I guess what you really need to do is do test sections for the welding and then do all the required tensile and bend tests for weld acceptance.
You will also need to look very seriously at fatigue loading and stress concentrations at and around that weld. Dimensions and angles of that ramp need to be shown.
I have a feeling the max deviations are 1/3 t of the thicker pipe, but maybe that relates to other things.
That's my take on it.
Remember - More details = better answers
Also: If you get a response it's polite to respond to it.
RE: Thickness Build up
Thanks
RE: Thickness Build up
Why not machine a taper on the CS flange to 11 mm and then add 3 mm Inconel overlay to bring you to 14 mm total at the root ?
RE: Thickness Build up
RE: Thickness Build up
I would start at a minimum axial length of the build up at least the thickest pipe thickness then ramp at 30deg max to your pipe thickness.
Actual tests, especially fatigue, will be required.
Remember - More details = better answers
Also: If you get a response it's polite to respond to it.
RE: Thickness Build up
I am lost - I thought the flange was C/S ?
"Thanks for joining this thread,Flange is prefabricated and solid inconel ,also for pressure design consideration"
I am not an engineer but if your piping is rated to 14 mm WT where does "pressure design considerations" come into the equation ?
LI,
Your thoughts on my suggestion"? I thought it was valid but if not would appreciate learning why not.
Cheers,
DD
RE: Thickness Build up
I will be very appreciated if you have any information on this.I am here for your guides
I like the way you think.
RE: Thickness Build up
Why there is no room for even a short Inconel transition piece from 22mm thick to 14mm thick is not clear - for me even a 100mm long transition piece would do much better than this overlay welding idea.
There is no "formula" I am aware of for what the OP is looking at - I guess you could do an FE analysis, but no simple diagram.
Remember - More details = better answers
Also: If you get a response it's polite to respond to it.
RE: Thickness Build up
Thanks
RE: Thickness Build up
• Longitudinal hub stress:is the bending stress that varies through the hub thickness this stress as essentially a bending stress with
the maximum stress being nearly always at either extremity of the hub.
• Radial stress, consists of two components, the bending stress caused by the radial bending moment and the membrane stress caused by in-plane surface loads on the inside diameter
• Tangential stress the bending stress caused by the circumferential bending moment and the circumferential stress due to membrane stress
caused by in-plane surface loads on the inside diameter
Between these stresses,the tangential stress affected by hub thickness reduction extremely,In attached file you can see by reducing g0(hub thickness from 1.06 in to 0.5 in)St rises rapidly.