INTELLIGENT WORK FORUMS
FOR ENGINEERING PROFESSIONALS

Log In

Come Join Us!

Are you an
Engineering professional?
Join Eng-Tips Forums!
  • Talk With Other Members
  • Be Notified Of Responses
    To Your Posts
  • Keyword Search
  • One-Click Access To Your
    Favorite Forums
  • Automated Signatures
    On Your Posts
  • Best Of All, It's Free!
  • Students Click Here

*Eng-Tips's functionality depends on members receiving e-mail. By joining you are opting in to receive e-mail.

Posting Guidelines

Promoting, selling, recruiting, coursework and thesis posting is forbidden.

Students Click Here

Jobs

Minimum outside air on VAV

Minimum outside air on VAV

Minimum outside air on VAV

(OP)
Hello,

Does anyone have a genuine control strategy to control and maintain minimum outside air on a VAV system?

Thanks!

RE: Minimum outside air on VAV

Having a separate minimum outside air and variable air louver seems to have worked best for me, and is a lot easier on TAB contractors.

RE: Minimum outside air on VAV

Use a dedicated injection fan

RE: Minimum outside air on VAV

A dedicated injection fan.

RE: Minimum outside air on VAV

you can use OA reset with a CO2 sensor in return.
Even better would be to use an ERV for ventilation, that would equal the above injection fan.

RE: Minimum outside air on VAV

Consult the rooftop manufacturer, they have the best knowledge of their product and product control.

RE: Minimum outside air on VAV

Are you asking about ensuring the minimum OA gets into the air handler, or that the min OA reaches each individual space served by a VAV box?

RE: Minimum outside air on VAV

The ventilation calculations have a very good hold on this question. 62MZCalc, while a little difficult to initially understand, does a fabulous job in illustrating the amount of outside air at the design condition. And the International codes follow the same path, with differing equations to a point.

My main question would be, can you supply 30% of air to the space for heating (see ASHRAE 90.1) and still maintain the minimum outside air required?

RE: Minimum outside air on VAV

Have the VAV return fan track the VAV supply air fan with constant differential equal to the minimum OA CFM. You need airflow measuring station at the supply & at the return. Consider Air Monitor airflow measuring stations at each fan inlet.

RE: Minimum outside air on VAV

Calculation is more important and more complex than control strategy. You have to size VAV units to both provide cooling and fresh air in all conditions, including minimum load conditions.

Red Flag This Post

Please let us know here why this post is inappropriate. Reasons such as off-topic, duplicates, flames, illegal, vulgar, or students posting their homework.

Red Flag Submitted

Thank you for helping keep Eng-Tips Forums free from inappropriate posts.
The Eng-Tips staff will check this out and take appropriate action.

Reply To This Thread

Posting in the Eng-Tips forums is a member-only feature.

Click Here to join Eng-Tips and talk with other members!


Resources