INTELLIGENT WORK FORUMS
FOR ENGINEERING PROFESSIONALS

Log In

Come Join Us!

Are you an
Engineering professional?
Join Eng-Tips Forums!
  • Talk With Other Members
  • Be Notified Of Responses
    To Your Posts
  • Keyword Search
  • One-Click Access To Your
    Favorite Forums
  • Automated Signatures
    On Your Posts
  • Best Of All, It's Free!
  • Students Click Here

*Eng-Tips's functionality depends on members receiving e-mail. By joining you are opting in to receive e-mail.

Posting Guidelines

Promoting, selling, recruiting, coursework and thesis posting is forbidden.

Students Click Here

Jobs

Duplex Weld Overlay ER2209

Duplex Weld Overlay ER2209

Duplex Weld Overlay ER2209

(OP)

Hi Expert,

I have some issue regarding weld overlay using ER2209 (Duplex)

Is it possible to weld overlay ER2209 direct to carbon steel (1st Layer and 2nd layer with ER2209) instead of using buffer layer ER309L (1st Layer ER309L + 2nd Layer ER2209) , Is there any Corrosion problem as per G48 Testing or A923 testing ?
I just think ER2209 have %Cr and %Ni lesser than ER309L, so may be we need buffer layer to accomodate dilution on first layer.

Thank You

RE: Duplex Weld Overlay ER2209

Yes, you can directly deposit 2209 to carbon and low alloy steel because the 2209 filler metal composition is also for dissimilar metal welding. The dilution can be offset by additional weld layers over the carbon steel.

Here is a publication that I believe will help you further in understanding duplex ss.

http://www.imoa.info/download_files/stainless-stee...

RE: Duplex Weld Overlay ER2209

Getting this overlay to pass A923 will require very tight process controls.
Limited dilution and maximum cooling (low heat input) will be needed.
With good control you can meet the test requirements for cast 2205 with this overlay.

= = = = = = = = = = = = = = = = = = = =
P.E. Metallurgy, Plymouth Tube

RE: Duplex Weld Overlay ER2209

Hi Mr Tunsten,,
Please see the attachment for guidelines and additional information.You may use the option of:-
-straight Duplex 2209 deposition all through
-Barrier layer of 309L followed by 2209 Duplex,at least 2 layers of 2209 deposit is recommended for composition consistency
-Barrier layer of 309LMo followed by the rest as above.

I would think for consistent chemistry option 2 or 3 would be better.

G48A test is least forgiving.You need to get the Duplex consumables tested for G48A during procurement,before welding the PQR test coupon.

Thanks.

Pradip Goswami,P.Eng.IWE
Welding & Metallurgical Specialist
Ontario,Canada.
ca.linkedin.com/pub/pradip-goswami/5/985/299
All provided answer are personal opinions or personal judgements only. It's not connected with any employers by any means.

Red Flag This Post

Please let us know here why this post is inappropriate. Reasons such as off-topic, duplicates, flames, illegal, vulgar, or students posting their homework.

Red Flag Submitted

Thank you for helping keep Eng-Tips Forums free from inappropriate posts.
The Eng-Tips staff will check this out and take appropriate action.

Reply To This Thread

Posting in the Eng-Tips forums is a member-only feature.

Click Here to join Eng-Tips and talk with other members!


Resources