INTELLIGENT WORK FORUMS
FOR ENGINEERING PROFESSIONALS

Log In

Come Join Us!

Are you an
Engineering professional?
Join Eng-Tips Forums!
  • Talk With Other Members
  • Be Notified Of Responses
    To Your Posts
  • Keyword Search
  • One-Click Access To Your
    Favorite Forums
  • Automated Signatures
    On Your Posts
  • Best Of All, It's Free!
  • Students Click Here

*Eng-Tips's functionality depends on members receiving e-mail. By joining you are opting in to receive e-mail.

Posting Guidelines

Promoting, selling, recruiting, coursework and thesis posting is forbidden.

Students Click Here

Jobs

PQR P4 to P8 questions?

PQR P4 to P8 questions?

PQR P4 to P8 questions?

(OP)
The application this will be used for in the field is a steam line with a design temp of 869F and design pressure of 769 psig. The weld's are open butt on 1/2" diameter SA-335 P-11 to SA-312(316)both having a wall thickness of 0.147" The engineering spec requires that max hardness not exceed 225HBW they do not require PWHT per the t.

My planned PQR variables:

Pre heat of 300F

Process- GTAW (manual)
Base metals-
Pipe/tube specification SA-335 (P-11), nominal composition 1.25Cr-0.5Mo-Si, P-4 Group 1, Nominal pipe/tube size 4” Schedule 80s, 0.337”t

Pipe/tube specification SA-312 (TP304L) nominal composition 16Cr-12Ni-Mo, P-8 Group 1, Nominal pipe/tube size 4” schedule 80s, 0.337”t

Filler material-
ERNiCr-3, F-43, SFA 5.14, UNS# N06082


Single bevel groove w/o backing
Shielding gas (A5.32 SG-A)
Backing gas (A5.32 SG-A)


Typically 309 would be used for joining these two base metals? I concluded with consideration of the design temperature that the Inconel filler would be best utilized for this procedure.

I have a couple of questions.
1. Does this look like I am on the right track?
2. Should I go ahead and have impact's done on this PQR, I can't find any data for minimum design temp!

Thank you for your consideration and input of my first dissimilar PQR plan.....!

RE: PQR P4 to P8 questions?

1. Yes, your proposed variables and approach are acceptable. The Inconel is correct for the filler metal to avoid problems with 309 long term in elevated temperature service.
2. No, impact testing is not required. No need, the steam line operates at a design temperature where low temperature service is not applicable.

RE: PQR P4 to P8 questions?

(OP)
Thank you meteng!

Would it make sense to have the impacts to qualify this PQR for future WPS's? I believe once this PQR is qualified it will be good for welding each P-number to itself as well, just trying to maximize the PQR for alternative applications down the road?

Again, thank you for your reply!

RE: PQR P4 to P8 questions?

No. I prefer to do impact qualification when necessary. You may need to have the impact qualification for thicker materials.

Red Flag This Post

Please let us know here why this post is inappropriate. Reasons such as off-topic, duplicates, flames, illegal, vulgar, or students posting their homework.

Red Flag Submitted

Thank you for helping keep Eng-Tips Forums free from inappropriate posts.
The Eng-Tips staff will check this out and take appropriate action.

Reply To This Thread

Posting in the Eng-Tips forums is a member-only feature.

Click Here to join Eng-Tips and talk with other members!


Resources