INTELLIGENT WORK FORUMS
FOR ENGINEERING PROFESSIONALS

Log In

Come Join Us!

Are you an
Engineering professional?
Join Eng-Tips Forums!
  • Talk With Other Members
  • Be Notified Of Responses
    To Your Posts
  • Keyword Search
  • One-Click Access To Your
    Favorite Forums
  • Automated Signatures
    On Your Posts
  • Best Of All, It's Free!
  • Students Click Here

*Eng-Tips's functionality depends on members receiving e-mail. By joining you are opting in to receive e-mail.

Posting Guidelines

Promoting, selling, recruiting, coursework and thesis posting is forbidden.

Students Click Here

Jobs

Approach Slab on GRS detail used on Tennesee Fast Fix 8 Bridges

Approach Slab on GRS detail used on Tennesee Fast Fix 8 Bridges

Approach Slab on GRS detail used on Tennesee Fast Fix 8 Bridges

(OP)
Hello,

I'm looking for an end of bridge detail in which a precast approach slab is supported on GRS and post-tensioned to precast full depth deck panels, which are supported on steel or concrete beams. Apparently this detail was used on the Tennessee Fast Fix 8 bridges for I-40 over Clinton St. and CSX RR.

Does anyone know of this detail and could provide more information, or perhaps a link to these drawings? I've searched the TDOT website for the drawings and haven't been able to find them.

Thanks for any help.

Red Flag This Post

Please let us know here why this post is inappropriate. Reasons such as off-topic, duplicates, flames, illegal, vulgar, or students posting their homework.

Red Flag Submitted

Thank you for helping keep Eng-Tips Forums free from inappropriate posts.
The Eng-Tips staff will check this out and take appropriate action.

Reply To This Thread

Posting in the Eng-Tips forums is a member-only feature.

Click Here to join Eng-Tips and talk with other members!


Resources