INTELLIGENT WORK FORUMS
FOR ENGINEERING PROFESSIONALS

Log In

Come Join Us!

Are you an
Engineering professional?
Join Eng-Tips Forums!
  • Talk With Other Members
  • Be Notified Of Responses
    To Your Posts
  • Keyword Search
  • One-Click Access To Your
    Favorite Forums
  • Automated Signatures
    On Your Posts
  • Best Of All, It's Free!
  • Students Click Here

*Eng-Tips's functionality depends on members receiving e-mail. By joining you are opting in to receive e-mail.

Posting Guidelines

Promoting, selling, recruiting, coursework and thesis posting is forbidden.

Students Click Here

Jobs

Applying UCS-68 (b)

Applying UCS-68 (b)

Applying UCS-68 (b)

(OP)
Hello all,

I need a clarification regarding the application of UCS-68(b)
The equipment concerned here is Steam Airpreheater which basically consists of steam flowing in the tubes and air flowing across the tubes such that air is heated as it flows across the tubes.
The mechanical construction consists of Inlet and Outlet pipe manifolds to which the tubes are welded, with a U-Bend at the end.See the attached sketch for clarification.
Design conditions are as per mentioned below :
Design temp. – 290-C
Design pressure – 7 bar / FV
Required MDMT – (-) 49 C
Inlet header – 6”, Sch 80, SA 333 Gr 6 pipe
Outlet manifold – 3” Sch 80, SA 333 Gr 6 Pipe
Tube – 1” Sch 80 , SA 334 Gr 6
Corrosion allowance – 2.5 mm for Manifolds and Tubes
Since MDMT is lower than -45C, UCS-68 (b) requirements need to be checked.
Inlet and Outlet manifolds have enough excess thickness, so UCS -66 Stress ratio is well below 0.35 and hence, UCS-68 (b) is not applicable.
But, due to the application of Corrosion allowance, required thickness for tubes is just sufficient and hence, the stress ratio is more than 0.35 making application of UCS-68 (b) mandatory.
As per UCS-68 (b), PWHT is required for all welded joints if MDMT is colder than -45C and coincident ratio is > 0.35. However, this code para also provides the criteria for exemption from PWHT as per below :
a) Material is P No. 1– this condition is satisfied
b) It is impact tested at MDMT or lower temp (in this case Tubes are being impact tested at -56C, with absorbed energy values of 34J) – this condition is satisfied
c) Joints is type no. 1 , category A & B and is subject to 100% RT –
For the case under consideration, Tube to manifold joint is basically a Cat D joint, for which I donot find any mention in this clause.
So, does this mean that since only Cat A & B joints are exempt from PWHT, Manifold to Tube joints of Cat D should be stress relieved?
Or some thing else??

Am I missing something here?
Kindly help me understand.

Thanks a lot for your advice and efforts to read until this….

RE: Applying UCS-68 (b)

D2HANDLE, I tend to agree with your interpretation, PWHT is required.

I do find the SCH 80 designation for tubing a little confusing however.

Regards,

Mike

The problem with sloppy work is that the supply FAR EXCEEDS the demand

RE: Applying UCS-68 (b)

(OP)
SnTMan,

Thanks for sharing your opinion...

Red Flag This Post

Please let us know here why this post is inappropriate. Reasons such as off-topic, duplicates, flames, illegal, vulgar, or students posting their homework.

Red Flag Submitted

Thank you for helping keep Eng-Tips Forums free from inappropriate posts.
The Eng-Tips staff will check this out and take appropriate action.

Reply To This Thread

Posting in the Eng-Tips forums is a member-only feature.

Click Here to join Eng-Tips and talk with other members!


Resources