Earth bund design
Earth bund design
(OP)
Hi,
I have a earth bund retaining water of 3 meter. Can anybody let me know the design steps to check weather the dimension of earth bund is sufficient of not.Also if the water is freezing what is there impact.
I have a earth bund retaining water of 3 meter. Can anybody let me know the design steps to check weather the dimension of earth bund is sufficient of not.Also if the water is freezing what is there impact.





RE: Earth bund design
Need some freeboard over the 100 year flood elevation to avoid overtopping.
Need an impervious core section...
Rip-rap up and downstream on sloped sections, particularly considering icing. Tailwater rip-rap too.
Is there any spillway or weir section?
Mike McCann, PE, SE (WA)
RE: Earth bund design
What is the water source? What kind of soil do you have available to construct the embankment out of? What is the foundation material? Does anyone have regulatory authority over the embankment?
Mike Lambert
RE: Earth bund design
you will need to analyze and/or provide the following:
slope stability
seepage analysis
foundation preparation
freeboard
low level drain and high level spillway
settlement
inflow volume
rainfall volume
embankment cracking
constructability and maintenance