INTELLIGENT WORK FORUMS
FOR ENGINEERING PROFESSIONALS

Log In

Come Join Us!

Are you an
Engineering professional?
Join Eng-Tips Forums!
  • Talk With Other Members
  • Be Notified Of Responses
    To Your Posts
  • Keyword Search
  • One-Click Access To Your
    Favorite Forums
  • Automated Signatures
    On Your Posts
  • Best Of All, It's Free!
  • Students Click Here

*Eng-Tips's functionality depends on members receiving e-mail. By joining you are opting in to receive e-mail.

Posting Guidelines

Promoting, selling, recruiting, coursework and thesis posting is forbidden.

Students Click Here

Jobs

Attachment of support lugs to vessel

Attachment of support lugs to vessel

Attachment of support lugs to vessel

(OP)
in the 4th edition of Dennis Moss' Pressure Vessel Design Manual (p. 188), he says "the base plate of the lug can be attached to the shell wall or unattached." Anyone have experience doing this? We would like to minimize heat loss; and where base sits on the structural steel is a big heat sink. --- Thanks!

RE: Attachment of support lugs to vessel

See PIP (Process Industry Practices) VEFV1000 Vessel/S&T Heat Exchanger Standard Details.
Required thickness and dimensions must be determined by calculations using the design loads and allowable stresses at design temperature.

Regards
r6155

RE: Attachment of support lugs to vessel

Balancing the thermal design with the mechanical design can be challenging. I definitely have experience doing so - it's not as straight-forward as it might appear.

The PIP details that r6155 refers to, above, are a good place to start, but they don't address the thermal aspects.

RE: Attachment of support lugs to vessel

(OP)
Thanks r6155 & TGS4, I will take a look at that PIP. Several books that say different things in passing; i.e. Moss vs Brownell & Young who say "the top and bottom plates should have continuous welds as the maximum compressive and tensile stress occurs in these two plates". I am thinking Moss really means when it is low enough load that a Wolosewick approach with just 2 vertical gussets at each lug can get the job done (I have a large diameter incinerator full of refractory ...). COMPRESS uses the Bednar procedure and just assumes all the welds are the same, so I think I will look at it using a RISA 3D plate model and taper the bottom plate at the shell to a thickness where a full penetration weld is enough to take the tension. And, we're looking at putting some ceramic thermal standoffs between the lugs and structural steel. Appreciate any further comments!

Red Flag This Post

Please let us know here why this post is inappropriate. Reasons such as off-topic, duplicates, flames, illegal, vulgar, or students posting their homework.

Red Flag Submitted

Thank you for helping keep Eng-Tips Forums free from inappropriate posts.
The Eng-Tips staff will check this out and take appropriate action.

Reply To This Thread

Posting in the Eng-Tips forums is a member-only feature.

Click Here to join Eng-Tips and talk with other members!


Resources