Storefront Sill Bracing
Storefront Sill Bracing
(OP)
I am doing the light gage design on a structure with storefront systems as shown (see attached). As you can see, if I frame up cripple studs under the window, there is nothing to brace my sill track on the left side. Usually, the EOR has specified cantilevered tube steel to brace the sill, but not on this job. I could cantilever up some cripple studs using moment clips at the slab but these are expensive, labor intensive and the stiffness is questionable. I am thinking about just throwing it back in the storefront supplier's lap and having his system provide bracing for the left end of the sill. Thoughts?






RE: Storefront Sill Bracing
RE: Storefront Sill Bracing
RE: Storefront Sill Bracing
RE: Storefront Sill Bracing
Funny, I have been doing jobs in NC for most of career but have recently started doing jobs in the DC area in the last five years. The drawings coming out of those northern areas seem to be alot worse with regards to the metal stud framing. Must be a cultural thing up there :>
RE: Storefront Sill Bracing
RE: Storefront Sill Bracing
RE: Storefront Sill Bracing
I suspect that Ron meant ‘adequate foundation’ or primary structure, not “adequate formation.” “The metal stud subs are always low man on the totem pole,” should not be the case. Pick up the damn phone and talk to the Arch. &/or EOR to be sure they correct this discrepancy, and do the proper coordination with the door/window supplier, and provide for your needs, since you really can’t fix it, given the way they detailed things. Then also put the note on your drawings, with big lettering. I’m really sick and tired of the way things are being designed and built these days. Everything is subbed out and delegated, to the point that nobody is really responsible for anything any longer. You do your thing, I do mine, and never the two shall meet or interact, the two parts never get coordinated until they get out on the job and don’t fit together, or work together. We are doing so much texting and e-mailing these days that we don’t have time to actually communicate, and more better BIM won’t fix this.
RE: Storefront Sill Bracing
RE: Storefront Sill Bracing
Consider that, per the contract documents, the Light Gage Metal Guy (LGMG)is responsible for the design of the light gage, non-load bearing, exterior wall and has included calculations and connection details for the EOR to review. In those calculations/shop drawings, the LGMG has provided connections and the transfer of loads to the storefront system. In my mind, that kind of detail is very much the responsibility of the EOR. What does the contract drawing show, probably a typical detail of a wall section. Maybe a typical wall to storefront detail, but it is unlikely that this detail was handled where the cripple wall ends against a door frame. The entire building is the responsibility of the EOR. The EOR has the authority, and therefore, the responsibility, to correct this problem.
RE: Storefront Sill Bracing
"foundation" "formation" you say tomato I say tomahto :>
Thanks for the all the advice. I have to pick my battles on this one as I have already had the EOR add a bunch of other stuff that he missed. I am running up on the deadline so I am going to show it on my drawings with the studs braced against the storefront with a big note and let them hash it out. My experience has been that EOR's do not like to add steel after the fact as they are worried about having to pay for it.
The whole process is backwards. Metal studs should be delegated, but it should be by the owner, EOR or Arch and engineered concurrently with the A&E drawings so all of these details can hashed out before the job gets bid. There would be tons of opportunities for savings as the subs would not have to throw a bunch of money into the bid unforeseen stuff.
RE: Storefront Sill Bracing
When a design is delegated the EOR's responsibility is the structure used to support the delegated design.
RE: Storefront Sill Bracing
I have to disagree with this. When delegating a design, it is incumbent on the EOR to provide reasonable structure for the metal studs to function efficiently. Would you send out a job where the metal studs have to frame out a 40' wide window? Sure it could be done, but it would be ridiculously inefficient.
RE: Storefront Sill Bracing
RE: Storefront Sill Bracing
RE: Storefront Sill Bracing
RE: Storefront Sill Bracing
"11.The structural engineer relied heavily on the filigree fabricator for the structural design of the exterior bay between grid line 1 and 4, levels P4 thru PS. The structural engineer did not conduct independent structural calculations to proportion the negative reinforcements, shear reinforcement, and potential torsion on the exterior beam. The responsibility of the design rested solely with the structural engineer of record."
and
"12.The structural drawings lacked clarity."
https://www.osha.gov/doc/engineering/2003_10.html
I could see similar statements being leveled at an EOR who didn't provide sufficient load path detail. For instance "The structural engineer relied heavily on the light gage steel fabricator for the structural design of the exterior walls. The structural engineer did not ... The responsibility of the design rested solely..."
RE: Storefront Sill Bracing
From section 6;
"The responsibility of design of all structural members, other than precast filigree members, must rest with the structural engineer of record."
The SEOR did not provide the structural members necessary to support delegated designed component. Instead relied on the delegated designed component manufacturer for structural engineering on structural components.
Needing to provide heavy gauge closely spaced studs is not the same as the arch. having 60' 3 5/8" studs.
RE: Storefront Sill Bracing
Obviously the days of zero change projects appears to have gone the way of the dodo bird, but that doesn't mean it's something we shouldn't strive for. I strive for zero RFI projects (haven't come close yet but it's still my goal). I also feel that you can't be a good EOR unless you've done your share of delegated work so you understand what should and should not be included in a good set of structural drawings.
RE: Storefront Sill Bracing
Thanks
RE: Storefront Sill Bracing
RE: Storefront Sill Bracing
RE: Storefront Sill Bracing
For example, I am in the middle of a steel stud design where the arch is expecting 3 5/8" studs to span 18.5'. I need them at 6" centres to work, is that at all reasonable, heck no, are they constrained in the room, nope. It was just no one decided to inform them of the standard limitations of steel studs. I'm lucky enough to work in an environment where we get our fair share of delegated and EOR work so I often get the chance to see both sides of the battle. I'd say more often than not, the delegated design is made difficult by poor EOR drawings (created by others).
RE: Storefront Sill Bracing
Allowable distributed load = 0.00 k, deflection at allowable load = 3.4 in (L/70) - I used a heavier stud at that.
RE: Storefront Sill Bracing
Yup!
RE: Storefront Sill Bracing