INTELLIGENT WORK FORUMS
FOR ENGINEERING PROFESSIONALS

Log In

Come Join Us!

Are you an
Engineering professional?
Join Eng-Tips Forums!
  • Talk With Other Members
  • Be Notified Of Responses
    To Your Posts
  • Keyword Search
  • One-Click Access To Your
    Favorite Forums
  • Automated Signatures
    On Your Posts
  • Best Of All, It's Free!
  • Students Click Here

*Eng-Tips's functionality depends on members receiving e-mail. By joining you are opting in to receive e-mail.

Posting Guidelines

Promoting, selling, recruiting, coursework and thesis posting is forbidden.

Students Click Here

Jobs

RPad at Tee

RPad at Tee

RPad at Tee

(OP)
Good Day!

I just want to ask regarding the Reinforcing Pad on a tee.
The existing header and branch has RPad of 4.75mm BUT based
on the stress analysis report the RPad required is 7.92mm.
The construction engineer inform us that they will just add
another plate (RPad) in the existing RPad (4.75mm) in order
to compensate the required 7.92mm.
My question is, is there any code or standard that deviates
the adding of another plate(RPad)? [4.92mm + ??? Plate = 7.92 mm]
Also, what will be the consequances or negative effects of these
additional plate?

Thank you in advance.

RE: RPad at Tee

What piping code is this to?

There should be guidance in there, but I'll be honest, it sounds like a quick fix to me which shouldn't be allowed.

How are they intending to join the two plates together?

My instinct is that unless the code specifically lets you do it, tell them it's not covered and do it properly.

Remember - More details = better answers
Also: If you get a response it's polite to respond to it.

RE: RPad at Tee

(OP)
LittleInch,

Actualy the plant is already too old that is why the construction team
are afraid to replace the RPad of the tee specialy it is 45deg. tee and they
are also afraid that by replacing the RPad might cause fatigue on the tee.

Regarding the process of joining the two RPAd, actualy I have no idea
about it but one way I think is by welding it in the side.

Maybe you have another way to solve the problem.

Thank you for your reply.

RE: RPad at Tee

My way is to cut out the tee and fit a proper one.

Anything else is a bodge.

IMO

Remember - More details = better answers
Also: If you get a response it's polite to respond to it.

RE: RPad at Tee

I think that you need to get a second opinion on what reinforcing pad is actually required. For in-service equipment, regardless of Code of Construction, I would recommend getting an API-579 Fitness-For-Service assessment performed. For a 45 degree tee, you will be looking at a Level 3 assessment.

I don't think that slapping an additional plate on top of an existing reinforcing pad will do much. And completely replacing an existing reinforcing pad will not, in and of itself, cause fatigue.

RE: RPad at Tee

(OP)
TGS4 & LitteInch,

Thank you for your advice.

I'll consider all your opinions.

Red Flag This Post

Please let us know here why this post is inappropriate. Reasons such as off-topic, duplicates, flames, illegal, vulgar, or students posting their homework.

Red Flag Submitted

Thank you for helping keep Eng-Tips Forums free from inappropriate posts.
The Eng-Tips staff will check this out and take appropriate action.

Reply To This Thread

Posting in the Eng-Tips forums is a member-only feature.

Click Here to join Eng-Tips and talk with other members!


Resources