INTELLIGENT WORK FORUMS
FOR ENGINEERING PROFESSIONALS

Log In

Come Join Us!

Are you an
Engineering professional?
Join Eng-Tips Forums!
  • Talk With Other Members
  • Be Notified Of Responses
    To Your Posts
  • Keyword Search
  • One-Click Access To Your
    Favorite Forums
  • Automated Signatures
    On Your Posts
  • Best Of All, It's Free!
  • Students Click Here

*Eng-Tips's functionality depends on members receiving e-mail. By joining you are opting in to receive e-mail.

Posting Guidelines

Promoting, selling, recruiting, coursework and thesis posting is forbidden.

Students Click Here

Jobs

As-Built Piling Plan

As-Built Piling Plan

As-Built Piling Plan

(OP)
Dear All,

I have an enquiry. For an as-built plan, does it have to include all the eccentricities in the drawings? or just those eccentricities that exceed pile tolerances?

Actually, what are the standard requirements or what must to be shown on the as-built piling plan?

Thank you.

#LoveWins

RE: As-Built Piling Plan

Regarding your inquiry: we don't know how your piles are being used (under a building, supporting equipment foundations, etc.). However, if these piles are under a building foundation, then around here, our record drawings only specifically note those piles which are out of tolerance, moved, replaced, or supplemented. I hope this makes your job simpler.
Dave

Thaidavid

RE: As-Built Piling Plan

(OP)
Dear thaidavid40,

Thanks for your response. So it does not necessarily need to indicate the eccentricities within the pile tolerance? Then, for those piles which are moved but within the tolerance, you will just provide Pile Eccentricity Report/Summary to the consultants?

Thanks

#LoveWins

RE: As-Built Piling Plan

By moved, I mean a pile which has been shifted intentionally to some out-of-tolerance location. This usually happens when an underground obstruction prevents driving a pile to its intended depth. It would necessarily then be noted as such in the record drawings.
Dave

Thaidavid

RE: As-Built Piling Plan

What do the Contract documents say? Typically, they will require Contractor to note deviations from the Contract only. However, on our marine pile projects, we require actual pile locations be determined by the Contractor based on a legal survey.

Red Flag This Post

Please let us know here why this post is inappropriate. Reasons such as off-topic, duplicates, flames, illegal, vulgar, or students posting their homework.

Red Flag Submitted

Thank you for helping keep Eng-Tips Forums free from inappropriate posts.
The Eng-Tips staff will check this out and take appropriate action.

Reply To This Thread

Posting in the Eng-Tips forums is a member-only feature.

Click Here to join Eng-Tips and talk with other members!


Resources