INTELLIGENT WORK FORUMS
FOR ENGINEERING PROFESSIONALS

Log In

Come Join Us!

Are you an
Engineering professional?
Join Eng-Tips Forums!
  • Talk With Other Members
  • Be Notified Of Responses
    To Your Posts
  • Keyword Search
  • One-Click Access To Your
    Favorite Forums
  • Automated Signatures
    On Your Posts
  • Best Of All, It's Free!
  • Students Click Here

*Eng-Tips's functionality depends on members receiving e-mail. By joining you are opting in to receive e-mail.

Posting Guidelines

Promoting, selling, recruiting, coursework and thesis posting is forbidden.

Students Click Here

Jobs

Verification of passivation - A967 standard interpretation

Verification of passivation - A967 standard interpretation

Verification of passivation - A967 standard interpretation

(OP)
Our company outsources to two passivation companies, both are required to "Passivate per ASTM A967, Nitric 1" and supply certificates. One company has an internal requirement to always verify effectiveness of passivation with each lot and the other will only verify effectiveness of passivation when requested. Both companies certify they meet our requirements even though the one doesn't verify effectiveness. It was my interpretation that in order to meet A967 you have to verify effectiveness with each lot. It's possible the company who does not verify passivation interpreted our requirement as meaning passivate following A967 specs and certify just the passivation process.
Items we need to work through with our vendor and revise requirements as necessary.

My question is, am I interpreting the standard correctly that effectiveness must be done in order to certify that A967 was met?

Thanks

RE: Verification of passivation - A967 standard interpretation

I see no wording in A 967 that requires verification of each lot, once you have verified your process.
If they have records of acid concentration, temperature, and times then they can say that they are providing the same process.

= = = = = = = = = = = = = = = = = = = =
P.E. Metallurgy, Plymouth Tube

RE: Verification of passivation - A967 standard interpretation

(OP)
Thank you for the response. Sections 13.3 and 17 specifically are what led me to make my conclusion about verification testing. Are you saying that if they supplied us with process conditions, certificate of analysis perhaps, instead of verification testing, this would suffice?
I can tell you that we only get a certificate of conformance from this vendor, we do not get a record of their process conditions (section 17.2).

RE: Verification of passivation - A967 standard interpretation

We do not supply either, but when asked we will show a customer our process, the process control records, and show where in the past this process has demonstrated passing the tests.
We will not supply process info on the cert.

= = = = = = = = = = = = = = = = = = = =
P.E. Metallurgy, Plymouth Tube

Red Flag This Post

Please let us know here why this post is inappropriate. Reasons such as off-topic, duplicates, flames, illegal, vulgar, or students posting their homework.

Red Flag Submitted

Thank you for helping keep Eng-Tips Forums free from inappropriate posts.
The Eng-Tips staff will check this out and take appropriate action.

Reply To This Thread

Posting in the Eng-Tips forums is a member-only feature.

Click Here to join Eng-Tips and talk with other members!


Resources