×
INTELLIGENT WORK FORUMS
FOR ENGINEERING PROFESSIONALS

Log In

Come Join Us!

Are you an
Engineering professional?
Join Eng-Tips Forums!
  • Talk With Other Members
  • Be Notified Of Responses
    To Your Posts
  • Keyword Search
  • One-Click Access To Your
    Favorite Forums
  • Automated Signatures
    On Your Posts
  • Best Of All, It's Free!
  • Students Click Here

*Eng-Tips's functionality depends on members receiving e-mail. By joining you are opting in to receive e-mail.

Posting Guidelines

Promoting, selling, recruiting, coursework and thesis posting is forbidden.

Students Click Here

Jobs

Opening a baselined Assembly an an specific Rev level

Opening a baselined Assembly an an specific Rev level

Opening a baselined Assembly an an specific Rev level

(OP)
Hi everybody,
in my current company we will start using baseline to save an interim version of our WIP designs as a timestapm of development proccess. So I it creates someting like this:

ASSY001.A.001
PART001.A.001
ASSY002.A.001
PART002.A.001
PART003.A.001
PART004.A.001

I identify this rev 001 as prototype001

If create new baselines for some modified parts I will have

ASSY001.A.001
PART001.A.001
ASSY002.A.002
PART002.A.001
PART003.A.006
PART004.A.004

when I open the top assembly, It will always open the latest baselines, no mater what Load Options I select. Is there any way that I can open all the structure at the same revision 001?

I tried Precise Baseline. As Saved, an d all available Load Options in my Tc. Any help

Thanks in advance

Red Flag This Post

Please let us know here why this post is inappropriate. Reasons such as off-topic, duplicates, flames, illegal, vulgar, or students posting their homework.

Red Flag Submitted

Thank you for helping keep Eng-Tips Forums free from inappropriate posts.
The Eng-Tips staff will check this out and take appropriate action.

Reply To This Thread

Posting in the Eng-Tips forums is a member-only feature.

Click Here to join Eng-Tips and talk with other members!


Resources