Sealing designs produced in India?
Sealing designs produced in India?
(OP)
Hey all,
I find myself stuck in a moral and ethical dilemma.
For the next 6 months my company sub'ed me out to a large corporation, where I am to review and seal designs created in India.
I guess this is the new normal in the push to Globalization.
I contacted my state Board to see if this violates the ethics policy. They were unwilling to comment.
Also contacted the state professional society, they were only able so far to give their personal opinion.
Of course there is this gray area about stamping other designs.
Some say no, never, others are ok with it assuming you review it fully.
But this feels even bad to me, like I am a pawn in a corporate shell game.
I sit here now on the fence, juggling my own responsibilities, my own conscience and whether I should just go along to get along.
Or refuse to do this work, and see what happens.
What say you?
I find myself stuck in a moral and ethical dilemma.
For the next 6 months my company sub'ed me out to a large corporation, where I am to review and seal designs created in India.
I guess this is the new normal in the push to Globalization.
I contacted my state Board to see if this violates the ethics policy. They were unwilling to comment.
Also contacted the state professional society, they were only able so far to give their personal opinion.
Of course there is this gray area about stamping other designs.
Some say no, never, others are ok with it assuming you review it fully.
But this feels even bad to me, like I am a pawn in a corporate shell game.
I sit here now on the fence, juggling my own responsibilities, my own conscience and whether I should just go along to get along.
Or refuse to do this work, and see what happens.
What say you?






RE: Sealing designs produced in India?
http://www.nspe.org/resources/issues-and-advocacy/...
Does not sound like you meet their criteria which is great because we need to keep these jobs local.
I work for an Architect who actually opened an office in India. Lots of mistakes on their drawings because they are really slack on their review process.
RE: Sealing designs produced in India?
RE: Sealing designs produced in India?
- These calculations and drawings that you are stamping, are you able to do that design on your own or is there information that you are not familiar with? You will need to present that to a jury.
- Make sure you can show that you have provided actionable comments that are responded to. I would think this especially important during the first several projects or so. Keep copies of those bloodied up drawings and calcs.
- For projects that take longer than 1 week, I suggest having several phases to the review and completion.
- Collect copies of everyone's resume for your file. Make it a point to call and talk to the people doing the work at least a couple times. Document the conversations on a log (I don't care what time zone they are in, talking on the phone is irreplaceable and they work for you).
- Make sure they work for you and not some company. You receive the project. You deliver the project to the workforce with notes. You receive updates on the drawings and calcs. You are kept abreast of client input. You are completely satisfied with the work when it is completed.
If an engineer presented this to me in a courtroom, I'd be more than satisfied that they exercised responsible charge.
RE: Sealing designs produced in India?
RE: Sealing designs produced in India?
Teguci, above, outlined some very good items.
I would suggest that, as the EOR, your "review" would look very much like what you would do if you originally design the structure.
The difference is that you didn't have to perform the following:
1. Invent the framing layout, details, and connections from scratch - that process has been completed.
2. Prepare the drawings, notes and specifications.
3. Coordinate with other disciplines such that the structural work is consistent with the others.
HOWEVER!!!
For the items above you should also:
1. Completely analyze the framing independently to verify sizes of all members (not just a few but all).
2. Verify connection capacities and configurations.
3. Ensure the drawings are complete and consistent with the code and with other disciplines.
4. Correct errors or problems in the design and ensure that the revisions are integrated into the set.
So in essence, your review should or could almost take as much time as an original design.
The company you work for is probably assuming that they can save tons of cash by using the foreign engineers and your time would be minimal.
I think your time on the project would be much more involved than they are presuming.
Check out Eng-Tips Forum's Policies here:
FAQ731-376: Eng-Tips.com Forum Policies
RE: Sealing designs produced in India?
I posted this in the ethics forum, check that out for more updates.
RE: Sealing designs produced in India?
The fact that you are asking the question, makes me thing you are not very comfortable with the situation.
Good luck.
Mike Lambert
RE: Sealing designs produced in India?
You should actually not be very comfortable with your current employer, if they would put you in this position. It shows that they have no understanding of, and little regard for, the obligations and responsibilities of a P.E. and the use of their seal and signature. They may insure and defend you, and/or they may not defend you when the chips are down. In fact they might try to fire you to avoid the difficulties, or at least learn quickly that they can claim you are responsible for your own actions as regards the use of your stamp, and you’re on your own. Their current actions seem to indicate they might stoop to this level. You better get this all ironed out before you agree to this arrangement. In any case, that’s your licence, your livelihood, your obligation to act responsibly, ethically, and to protect the health, safety and well being of the public. This arrangement is probably not impossible to do, but you must have considerable control over how it is done, who’s doing the work under your supervision, the ability to check and reject plans, details, specs., work in general, when it does not meet code and normal engineering standards. Responsible charge, under your direct supervision, does not mean you have to hold every worker’s hand while they work on your projects, but you are ultimately responsible for the entire work package, so you better be comfortable with all of their abilities.
RE: Sealing designs produced in India?
Mike McCann, PE, SE (WA)
RE: Sealing designs produced in India?
I get a (hopefully complete) design from random Indian guys and gals that I am supposed to review and stamp. I have little to no contact with the actual individuals who did the work. I'm essentially being paid for my stamp.
And:
I'm in the US but working closely with a bunch of designers in India who are doing a lot of the work under my direction. I have close, direct contact with everyone doing anything that my stamp is going on. Or at the very least, close and direct contact with a technical supervisor who I trust. I talk with them almost daily, checking in on work, providing guidance, and answering questions. Ideally this gets to the point where some of these people could theoretically get licensed themselves if they've got the credentials for it.
The first one is a giant no thanks from me. Company can find some other sucker to do it for them and take the fall when something inevitably goes south because I missed something during my reviews. If they say that's how it's going to be or I can take a hike, then bye.
RE: Sealing designs produced in India?
That being that I'm not going to affix my PE seal to this work.
After a quiet day back at my home office friday, my super told me that he discussed this with the owner, and he is okay with it.
Not gonna get fired, there is other work to do......cool
However........ I failed to really make clear where I'm at on this.
Cause, the expectation shifted to now reviewing the design for him to seal.
Oy Vey! the says to myself..........what now Batman
So since i put most of the time friday on overhead, (nothing to do) I gets a text friday evening about my time card.
Deep sigh.....muster up courage......my help is on the way.
So, I call the super to explain.....and tell him that I want nothing to do with this project, zero, I don't even want to discuss it in any capacity.
awkward moment of silence........"ok"........ hurdle cleared
Monday awaits.
RE: Sealing designs produced in India?
"However........ I failed to really make clear where I'm at on this.
Cause, the expectation shifted to now reviewing the design for him to seal.
Oy Vey! the says to myself..........what now Batman.
So, I call the super to explain.....and tell him that I want nothing to do with this project, zero, I don't even want to discuss it in any capacity."
Since you are also not comfortable checking calculations done in India for you Lead Engineer to sign, and you are a contractor on overhead, expect to be laid off soon.
RE: Sealing designs produced in India?
I also think if you extend the premise you set up for ironmon's employment is brought to its logical economic conclusion, he(she) is really just middle management fat waiting to be trimmed anyway.
RE: Sealing designs produced in India?
RE: Sealing designs produced in India?
Also most of projects/plants are located overseas, in middle east, etc.. so having a PE license in the US is not required most of the time.
Using your logic, US engineers shouldn't be awarded projects located overseas. The engineers in the country where the plant is located should get that project. We (US) are stealing their jobs.
RE: Sealing designs produced in India?
RE: Sealing designs produced in India?
In OP's case the plant/project is located in the US so it requires US PE to stamp the drawings. Probably the LNG plant in Lousiana.
Regardless, 50% (more or less) will still be sent to India to lower the bid or else another EPC will win the the project.
OP already said he's not ok stamping which I can understand but I don't know why he still not ok just checking the calculations.
RE: Sealing designs produced in India?
RE: Sealing designs produced in India?
My charge rate is ten times what the sweat shops charge, and I'm busy.
Cheers
Greg Locock
New here? Try reading these, they might help FAQ731-376: Eng-Tips.com Forum Policies http://eng-tips.com/market.cfm?
RE: Sealing designs produced in India?
Therein lies the problem . It will cost at least the amount of the savings to show that the design "is as good as yours" as you basically have to do a full design to check it thoroughly. This cost has to be added on and it is not in many cases.
RE: Sealing designs produced in India?
Cheers
Greg Locock
New here? Try reading these, they might help FAQ731-376: Eng-Tips.com Forum Policies http://eng-tips.com/market.cfm?
RE: Sealing designs produced in India?
So, No, the problem is that someone will be found to sign off on the design without doing the full check and incurring the costs of it. The cost is then shifted to the unknowing groups who end up owning the final product, if and when there are problems.
RE: Sealing designs produced in India?
In Ontario, as I presume it is in most North American jurisdictions, it doesn't matter who did the work, if you're going to stamp the drawings you're responsible for it. Many times you haven't done the original work, but if you're stamping it you've always checked it. What's the difference where your junior's desk is? It's your neck.
And I'm with Greg Locock: I charge what I want & I turn down work at least 2 or 3 times a week. Do a good job & you won't be able to do everything that comes your way; if the guys in India or wherever aren't doing the stuff we don't want, who is?
RE: Sealing designs produced in India?
The main reason an engineer should never do this is that most likely this is illegal and therefore, also unethical. All the states I know of require that, in order to be able to professionally seal engineering drawings, the engineer must have directly supervised the preparation of the drawings.
To Quote from Ohio’s Code:
“The engineer or surveyor shall not sign and/or seal professional work for which he or she does not have personal professional knowledge and direct supervisory control and responsibility.”
If the drawings were prepared in another country, an engineer receiving a finished drawing obviously does not have “direct supervisory control and responsibility.”
The customer went to a foreign source for the engineering because they were cheaper. The customer is coming to you NOT to review the drawings and calculations and NOT to make changes. He merely wants you to stamp the drawings and take financial responsibility for any errors or omissions. The customer is coming to you because you are the cheapest (or easiest) way he can get the drawings P.E. stamped. If you insist on too many changes to the drawings, the customer will find another engineer who is more liberal with his seal. To keep the customer, you must shut up and stamp.
Everyone in the engineering business knows a “hired gun”. This term means someone who will stamp any drawing after giving it at best a cursory review. Stamping drawings prepared by people who are not under your supervision at the time of the drawings creation is unethical and degrading to the engineering profession.
RE: Sealing designs produced in India?
havesealwilltravel's last sentence sums it up "Stamping drawings prepared by people who are not under your supervision at the time of the drawings creation is unethical and degrading to the engineering profession.".
As per comment made by rapt, you can sort of "act dumb" and keep on commenting on aspects that you feel are wrong, until the unnamed corporation realise their mistake.
I have on rare occasions, come across some excellent good design offices in India, in general they shared some characteristics, in that they were small(10-15 employees), with a generous sprinkling of experienced people( >15 years experience).
The seniors ones had worked outside with American&Western firms and having made their pot of gold had come back to India.
One of the things which has shockingly gone unnoticed in the West is that in last 20 years there has been a very aggressive and intense affirmative actions carried out based on caste preferences.Some of the states have a quota of 80-90% of reserved seats.This has brought down the quality of even the non-quota engineers down, as academic standards had to be watered down so that decent pass percentages could be achieveded.So the quality of newbies(7-8 years exp) is abysmally low even at elite IIT's.Reserved quota at IIT's itself is around 50%. I have come across engineers who could not calculate the weight of a steel plate given the length,breadth, thickness and steel density.You should bring this fact to notice, if you think that can help.
Having said the above, I suggest that you have an online interview with the design team in India to assess their capabilities, as there are some very good engineers in India, knowledgeable and with good communications skill.If you feel that review process is not rigorous, ask them to send in chk-prnts.
By the way I have come across some awful designs from USA too.I think the lesson is that if you want to outsource whether in or out of country, you should be doing thorough check on your team.