INTELLIGENT WORK FORUMS
FOR ENGINEERING PROFESSIONALS

Log In

Come Join Us!

Are you an
Engineering professional?
Join Eng-Tips Forums!
  • Talk With Other Members
  • Be Notified Of Responses
    To Your Posts
  • Keyword Search
  • One-Click Access To Your
    Favorite Forums
  • Automated Signatures
    On Your Posts
  • Best Of All, It's Free!
  • Students Click Here

*Eng-Tips's functionality depends on members receiving e-mail. By joining you are opting in to receive e-mail.

Posting Guidelines

Promoting, selling, recruiting, coursework and thesis posting is forbidden.

Students Click Here

Jobs

Masonry Pier and Curtain Wall

Masonry Pier and Curtain Wall

Masonry Pier and Curtain Wall

(OP)
I have a client who wants to open up an existing exterior wall as part of a renovation project. The opening is 10' wide into a new elevated sunroom. the loads at each end of the 10' opening are 4.2k. The property slope varies but max ht of a load bearing masonry pier/curtain wall is about 8'. What do you guys normally do to beef up the 4in brick curtain wall? All I can think to do is add CMU piers behind the curtain wall assuming there isn't one already there and attach blocking to the band to help transfer some of the load into the CMU and not all on the brick.

RE: Masonry Pier and Curtain Wall

I would not count on blocking to transfer the load to the CMU. If the posts are over the brick, it will go to the brick. I would epoxy some #3 rebar into the brick @ 16" O.C. that can be embedded in a grouted masonry pier. The pier will then brace the brick.
You also might want to check the brick on its own. It may be able to support 4.2k.

RE: Masonry Pier and Curtain Wall

(OP)
The brick is ok by itself. I just am not crazy about supporting fairly large concentrated loads on a single wythe. Was planning on bonding the CMU pier to the masonry with mortar. Mainly concerned as you say with out of plane loading due to incidental eccentricities.

RE: Masonry Pier and Curtain Wall

The mortar will probably work, but I have seen too many post-installed pilasters become un-bonded

Red Flag This Post

Please let us know here why this post is inappropriate. Reasons such as off-topic, duplicates, flames, illegal, vulgar, or students posting their homework.

Red Flag Submitted

Thank you for helping keep Eng-Tips Forums free from inappropriate posts.
The Eng-Tips staff will check this out and take appropriate action.

Reply To This Thread

Posting in the Eng-Tips forums is a member-only feature.

Click Here to join Eng-Tips and talk with other members!


Resources