INTELLIGENT WORK FORUMS
FOR ENGINEERING PROFESSIONALS

Log In

Come Join Us!

Are you an
Engineering professional?
Join Eng-Tips Forums!
  • Talk With Other Members
  • Be Notified Of Responses
    To Your Posts
  • Keyword Search
  • One-Click Access To Your
    Favorite Forums
  • Automated Signatures
    On Your Posts
  • Best Of All, It's Free!
  • Students Click Here

*Eng-Tips's functionality depends on members receiving e-mail. By joining you are opting in to receive e-mail.

Posting Guidelines

Promoting, selling, recruiting, coursework and thesis posting is forbidden.

Students Click Here

Jobs

Date in creo parametric

Date in creo parametric

Date in creo parametric

(OP)
Hi,
I have seen some discussions about &todays_date and I know that it inserts a string with the actual date and doesn't update.
Is there any way to use a parameter that update the date each time that I open the model or drawing file?
thanks.

RE: Date in creo parametric

@danielrendon123: I do not have an easy way to test this out right now, but you might try defining a parameter using a relation. Since relations are re-calculated each time a model/drawing is regenerated, that should updated the date as well. Something as simple as: LAST_OPEN = &TODAYS_DATE, then call &LAST_OPEN as the parameter to use should (and, as with any PTC product, I stress again should) work.

Red Flag This Post

Please let us know here why this post is inappropriate. Reasons such as off-topic, duplicates, flames, illegal, vulgar, or students posting their homework.

Red Flag Submitted

Thank you for helping keep Eng-Tips Forums free from inappropriate posts.
The Eng-Tips staff will check this out and take appropriate action.

Reply To This Thread

Posting in the Eng-Tips forums is a member-only feature.

Click Here to join Eng-Tips and talk with other members!


Resources