INTELLIGENT WORK FORUMS
FOR ENGINEERING PROFESSIONALS

Log In

Come Join Us!

Are you an
Engineering professional?
Join Eng-Tips Forums!
  • Talk With Other Members
  • Be Notified Of Responses
    To Your Posts
  • Keyword Search
  • One-Click Access To Your
    Favorite Forums
  • Automated Signatures
    On Your Posts
  • Best Of All, It's Free!
  • Students Click Here

*Eng-Tips's functionality depends on members receiving e-mail. By joining you are opting in to receive e-mail.

Posting Guidelines

Promoting, selling, recruiting, coursework and thesis posting is forbidden.

Students Click Here

Jobs

API plan 52 - barrier fluid / Inboard faces

API plan 52 - barrier fluid / Inboard faces

API plan 52 - barrier fluid / Inboard faces

(OP)
Hi here, when running a plan 52, unpressurised barrier tank, double seal. Is there any chance at all at contaminating the pumpage with the barrier fluid? I would say no as seal chamber pressure is above barrier tank pressure. If the inboard faces fail, pumpage would just leak into the barrier tank, correct?

Durco ANSI 2K3x2-10ARV pump
Double seal with pumping ring


RE: API plan 52 - barrier fluid / Inboard faces

Fluid rarely flows from lower pressure into higher pressure. So, no, it is not likely that you could contaminate the process with barrier fluid as long as the seal chamber pressure is higher than the barrier fluid pressure. But, as the old saying goes, “Never say never.”

Earlier today, we were examining a repeat failure of a tandem seal with a Plan 52. The inner seal stationary face was popped out of position and cocked in the housing. We found that the operators were filling the seal pot with fluid using a pump that pumps the fluid into the bottom of the pot. They were performing the initial fill of the pot with the top vent on the pot still blocked in to flare. When they filled the pot from empty to normal level, pressure was building in the pot higher than the static pressure in the pump case and some of the barrier fluid was forced into the process, pushing the mating ring out of its fit.

We have only started using pressure pumps to fill our seal pots from the bottom in the past few years. Before that, operators would open a plug on the top of the pot and pour in the barrier fluid using a funnel. Because of concerns with exposure to flare gas, we converted our pots using quick-connect fittings on the bottom connection and set up carts in the control room so that they can add barrier fluid under pressure without removing that top plug. This is safer for the operators and allows them to add barrier fluid even if the pump is running. But, we did not initially realize that the method of adding barrier fluid now has the potential to build pressure in the seal pot if they add fluid when the vent to flare is blocked in.

Johnny Pellin

RE: API plan 52 - barrier fluid / Inboard faces

(OP)
Thanks Johnny!

RE: API plan 52 - barrier fluid / Inboard faces

You could have barrier fluid getting into the pumped fluid when the pump is not running ?

Red Flag This Post

Please let us know here why this post is inappropriate. Reasons such as off-topic, duplicates, flames, illegal, vulgar, or students posting their homework.

Red Flag Submitted

Thank you for helping keep Eng-Tips Forums free from inappropriate posts.
The Eng-Tips staff will check this out and take appropriate action.

Reply To This Thread

Posting in the Eng-Tips forums is a member-only feature.

Click Here to join Eng-Tips and talk with other members!


Resources